PROFESSIONAL MASTER PROGRAM IN
PROJECT MANAGEMENT SPECIALIZED IN CONSTRUCTION (MPM) Intake 2013
Introduction
The Project Management in
Construction field of study trains professionals to play a leading role in the
international construction industry. It molds students to become active leaders
in the construction industry and large construction project. The program prepares for students:
- To become outstanding managers and decision-makers familiar
with the modern techniques of
construction management, engineering management and infrastructure management.
- To more competent and capable to manage international large
construction projects
- To be able to assist the corporation to install and develop
project management system in a company
Main Features of the Program
•
One year professional AIT
Master’s degree.
•
Credits can be accumulated over
two years
•
Certificate course works
•
International field trip to the
large construction sites in the region
•
Study language: English.
Program
Structure
AIT Professional Master Program
is designed for those engineers who cannot leave their work while following a
master program. The program is conducted in one year. To complete the master
program, participants need to complete 11 courses and 1 project report with
total 33 credits.
In the first two semesters,
students will take basic and advanced courses selected in consultation with an academic/thesis
advisor from among the regular courses offered at AIT. During the third
semester, students will carry out their project study. Students will conduct
international field trips:
-
First trip: Study at AIT
-
Second trip: visit to the large
construction sites outside Vietnam,
such as Thailand, Singapore, Malaysia,
Indonesia, China and Taiwan
or do internship in AIT Thailand
-
Third trip: to AIT to attend Graduation
ceremony
AIT certificate can be given for those students who would like
to register for a course offered of the AIT Professional master program.
Credits gained from certificate courses can be transferred to AIT Professional
Master Program.
English
Entry Requirement
AIT is
an international institute with English as the sole language of instruction.
Admission to AIT requires proof of English language proficiency which may be
satisfied in any requirement of the following:
·
IELTS (4.5)
·
TOEFL (Paper -based: 500; Computer - Based:173;
or Internet - based: 61)
· AITEET. Applicants can apply for English
Test offered by AIT at AIT-VN. English Test fee: 420,000 VND.
Entry Requirements
To be
eligible for admission to the AIT Professional master's program, an applicant
must:
· Hold a Bachelor degree (normally from a four-year
program), or its equivalent, in an appropriate field of study.
·
Have undergraduate grades significantly above
average.
·
Have good command of English
·
At least three year of working experiences
Application
form can be downloaded at www.aitcv.ac.vn .
Application submission fee: 420,000 VND.
This fee is paid to AITCV when applicants submit the application documents.
Teaching
Schedule
The program is conducted during
non-working hours (weekends and evenings)
Faculty
Faculties are from Construction Engineering and Infrastructure
Management (CEIM) program – AIT and professional experts from industry. CEIM is highly experienced in project
management education, from short training programs to master programs, doctoral
programs and post-doctoral programs. So far, there are more than 300 masters
and 12 doctors graduated in Project Management program and more than 500
trainees from short training programs received certificates offered by CEIM.
CEIM also have its strong partnership with government’s construction organizations
and industrial zones in providing consultancy services and professional
researches to enhance the quality of construction projects.
Curriculum
No
|
Code
|
Course
|
Core course:
|
||
1
|
CE70.12
|
Organizational Management in
Construction
|
2
|
CE70.21
|
Integrated Project Planning and
Control
|
3
|
CE70.11
|
Project Cost and Financial
Management
|
4
|
CE70.44
|
Communication and Negotiation skills for
Project Managers
|
5
|
CE70.33
|
Safety and Health Management in
Construction
|
6
|
CE70.22
|
Legal and Contractual Risk
Management
|
7
|
CE70.43
|
Project Financing
|
8
|
CE70.13
|
Quality Management
|
Applied Project Management courses
|
||
9
|
Applied PM in Construction
Business and Project Simulation
|
|
10
|
Applied Project Management in
Highway Projects
|
|
11
|
Applied PM in High-rise Building
Projects
|
|
12
|
Applied Project Management in Housing
and Real Estate Projects
|
|
13
|
Applied Project Management in
Commercial Projects
|
|
14
|
Applied Project Management in
Public Infrastructure Projects
|
|
15
|
Applied Project Management in
Petrochemical Project
|
|
English
Training Program
AIT-VN will conduct 8 weeks intensive English Training
for those who need to improve their Academic English Skills before joining the
program. The English Training Program also guides participants how to conduct
AITEET.
Language
The program is conducted in English
Admission Schedule
For
Hanoi & HCMC
Intake
|
August 2013
|
Deadline
for application
|
31
July 2013
|
Deadline
for Interview & Test AITEIT
|
Any
time
|
Intensive
English Training
|
19 March 2013
|
First class
|
September 2013
|
Tuition and Fees
Tuition
and fees can be paid as 3 installments and at the beginning of each semester.
Total tuition and fees: VND 284,285,625 (VND7,824,375/credit).
Break down of tuition and fees is:
1. Registration
fee: VND 10,432,500
2. Tuition
fee for 1st semester: VND 93,892,500
3. Tuition
fee for 2nd semester: VND 86,068,125
4. 1st
International fieldtrip fee: VND
15,648,750
(8
days, 7 nights)
5. Tuition
fee for 3rd semester: VND 78,243,750
6. 2nd
and 3rd Int. fieltrip fee: VND 32,340,750 (*)
* Optional
for 2nd and 3rd trip. Fee includes: air ticket, transportation,
insurance and accommodation.
**
R.O.E = 20,865 VND/1 USD. AIT reserves the right to apply the adjust tuition
and fees without prior notice.
Contact:
For morde detailed information please kindly drop
at:
www.professionalprojectmanagement.blogspot.com
Asian Institute of Technology in Viet Nam
Ha Noi Office
|
Asian Institute of Technology in Viet Nam
HCM Office
|
|
Mr.
Tran Anh Tuan
|
Ms.
Nguyen Le Tuong
|
|
Tel:
(84-4) 37669493 (131)
|
Tel:
(84-8) 39107423 (117)
|
|
Cell:
01 285 687 168
|
Cell:
01 285 265 168
|
|
Email:
anhtuan@aitcv.ac.vn
|
Email:
ngletuong@aitcv.ac.vn
|




