This is a blog managed by Construction, Engineering and Infrastructure Management (CEIM) at Asian Institute of Technology, Thailand. In this blog, CEIM shares our activities in providing excellent professional project management education at Master and Doctoral levels in Thailand, Indonesia and Vietnam. http://www.set.ait.ac.th/ceim/
Thursday, 6 December 2012
Tuesday, 4 December 2012
GOOD NEWS
Hi
Dr. Hadi,
Would like to give you an update since many things have happened recently. Now I have completely finished my PhD. The award will be conferred on 19 December. Concerning my job hunting, I received two offers from UNSW and Australian Defence Force Academy. Both were really good and after much consideration, I decided to take the offer from the UNSW. I will formally be a lecturer there on 7 January.
Regards,
Mr. Riza Yosia Sunindijo
CEIM-2004
Friday, 30 November 2012
Development
of Quality Management System in Hospital Construction Project - A Case Study of
the Projects Management Board of Investment and Construction of Thoi Lai
Districts
by
NGUYEN
TIEN THUC
Abstract
The report raises important issues
in quality management systems (QMS), it emphasizes the important factors for
any organization that would grow and survive in the free trade market.
In which this study refers to the theory and the standard system, presents the concept of quality in construction, models of quality management systems in the organization, the requirements necessary for system quality management of the Owner in construction and its benefits. The research presented briefly the factors most affecting the quality of the project from the public report and the key points to control the quality of construction from design phase to construction phase. The report introduced a model of QMS for the construction company for the purpose based on the available model of quality control and edit the successful application of model quality management of the company to have is a project that really matter.
In which this study refers to the theory and the standard system, presents the concept of quality in construction, models of quality management systems in the organization, the requirements necessary for system quality management of the Owner in construction and its benefits. The research presented briefly the factors most affecting the quality of the project from the public report and the key points to control the quality of construction from design phase to construction phase. The report introduced a model of QMS for the construction company for the purpose based on the available model of quality control and edit the successful application of model quality management of the company to have is a project that really matter.
Report the results of a study, carried out to examine the basic factors affecting the quality of a construction project. It also aims to identify the factors showed a strong correlation to performance quality. The ultimate goal is to provide clients, project management, monitoring, consulting and contractor information can help them become more effective with their limited resources and achieve the ultimate goal better quality.
Executive summary
Rationale of research
This research has been conducted to study quality issues in
construction projects of Vietnam, in recent years quality of construction works
marked as question in public as well as private projects.
Objectives of study
To propose recommendation for improvement in quality of
construction by studying and analysing
quality management systems and practices in construction projects,
quality management system in development and implementation in hospital
construction project.
Methodology
In this research, case study approach has been used to focus on
studying and analysing different sources of data to develop a quality
management model for owner
Exploratory research is used in reviewing the literature to
develop a model for building construction projects in Vietnam.
Findings and conclusion
By observing case of hospital construction project based on available data and observations it is very
much clear that the responsibilities at each level are clearly defined. The
overall management system of the project is clearly defined and managed, but
still there are some problems in some areas which needed to examine.
The project staff needs to train and encouragement for quality
of work, leadership and stability within organization.
Morale improvement of staff, customer focused and quality checks
from start of conceptual design.
Recommendations
Need of a clear mechanism from project manager to improve
quality in construction and to reduce risk of early quality.
·
Control
measures must be designed from the product when completed.
·
To
determine the quality control tasks from the beginning.
·
To
select the contractor fully qualified and experienced.
·
Regular
training and quality control training for staff.
Need of developing evaluation system from owner side, which will
collect and store updated data the contractors completed projects. The
evaluation system clearly defines the method of assessment.
·
Develop
a quality benchmarking assessment skills of construction contractors, materials
and equipment during construction.
·
Establishing
a benchmark for assessing the safety and sustainability of the project.
·
Establishing
a benchmark for assessing the response of work with the regulations on
construction rules and technical standards may be applied to build the project.
·
Establishing
a benchmark assessment of the art construction.
·
As
a basis for evaluating and scoring capabilities businesses such as contractors
involved in tendering for other projects.
·
As a basis, the documentation for quality
control of a new work.
·
Making facilities and materials for the
workshop on improving quality control in order to draw experiences for
subsequent work.
Monday, 26 November 2012
PROJECT FINAL EXAMINATION
MPM HO CHI MINH CITY - INTAKE 2011
23rd & 24th November 2012
Last 23rd and 24th November, MPM program organized Project Final examination for 18 MPM students at AITVN in Ho Chi Minh city. Committee members were Dr. Hadikusumo, Dr. Chotchai and Dr. Santi.
Students who have passed this exam will attend the Graduation ceremony at AIT Thailand on 18 December 2012.
Presentation of MPM5 student |
Group photo after exam |
Sunday, 25 November 2012
INVESTMENT COST CHANGES FOR
AGRICULTURAL PROCESSING PLANT
by
Nguyen
Nam Cuong
Abstract
Vietnam
is a developing country with about 70% of the population works in the fields
related to agriculture and rural. Through a process of development since the
Doi Moi to now, Vietnam has become one of the world’s leading exporters of rice
and many agricultural commodities such as coffee bean, cashew nut, black
pepper… However, almost of agricultural commodities are exported in raw
material types or semi products. On other hand, the procurement and exporting
system has not been paying attention enough to develop correspondingly.
As
the result, the value of exported agricultural products of Vietnam is normally
underestimated in the international markets because of low quality. The low
margin of agriculture products, in turn, contributes to increase income gap
between rural and urban area. Therefore, one of the key objectives of the
Vietnamese Government is to develop systems for storage and processing of
agricultural products, improving production and processing capacities, autonomy
in purchasing and export of agricultural commodities with quality, contributing
to improving Vietnam’s position on world agricultural markets.
Executive summary
Rationale of research
This research has been conducted to find out the way for capital
estimates and analysis of estimates
Through frame work, the focus of evaluation is on financial
problems analyze and change in actual cash flows and why these changes occur.
Objectives of study
To propose a solution through analysis, doing general
feasibility study of project and analysis, evaluation of project cost changes.
Methodology
The qualitative approach has been used to resolve issues during
construction to achieve performance.
The process includes data collection, processing and data
analysis. Considering mutual relationship inside and outside using standards,
normative in accordance and propose solution.
Findings and conclusion
Investment project being important document for owner to assess
investment decision, owner can see big picture of project.
However the important factor in investment project is
construction cost, which always seen with bias. The feasibility study is always
dependant on owner and consultant and project management methods so as to
reduce risk in cost fluctuation. And owner can control cash flows.
List of factors affecting
investment project
- Expertise and experience in project
management of the Owner.
- The financial capability of the Owner.
- The professional ability and knowledge
related to the field of investment consultancy and project design.
- Ability to coordinate the implementation
of tasks between the Owner and contractors design and consulting in the preparation
period of investment.
- Ability to coordinate between the Owners
and construction contractors in the construction process.
- The professionalism of the construction
contractor.
- Mechanisms and incentives to support
investment in the locality.
The
agricultural processing plant from initial stage to implementation is long
process with constant change; thus success of project depends upon owner
control on such movements and ensuring quality and time of investment.
During
the project, the change in cost is often by different reasons, divided into
four stages.
1. The cost of construction in terms of rates of
investment costs for Feasibility Study.
2. The cost determined by the total estimated cost.
3. The value determined by the construction contractor's
proposal is approved.
4.
The actual value of the settlement package.
It is
almost impossible to determine the final cost of each package at construction
stage except package having fix-price, and change in cost can only be observed
in above three steps.
For the
changes in fourth stage that can determine final value,it is necessary to
consider risk in construction process
·
Project
area actually decreased compared to the record.
·
The
detail design is inappropriate to the construction.
·
Price
volatility of construction materials.
·
Difficult
to find workers and construction equipment.
·
The
impact of weather on the construction process.
·
Fluctuation
of currency exchange rates.
The owner
can have actively appropriate countermeasures, to minimize the negative
impacts, including the choice of contractual form, in accordance, and contract
with the consultant of supervisor, design consultants and contractors to
strictly control the changes arising in the construction process. These are
also the mission of Project Management.