Safety Management In Steel Structure Fabrication And Erection

Safety in Construction is considered the success of project. In developed countries, safety is the always concern and closely controlled whereas in developing countries, in order to reduce expenses, this work seems unconcerned in many projects which results in many accidents that really affect the project seriously.

Safety in the fabrication and erection steel structure has always been a major problem. Steel construction is found to be one of the most dangerous on safety and health criteria, particularly in developing countries with a lot of accidents. Though much improvement in steel construction safety has been achieved, the steel structure fabrication and erection still continues to lag behind most other activities with regard to safety.

In Vietnam steel construction industry, safety accident rate is very high. This is due a lot of causes such as lack of workers’ awareness on safety, lack of safety training for workers to implement in the project, lack of PPE for workers, substandard construction equipments, lack of safety policy, safety plan, and so on.

The company-TT Construction has set the safety management system and it has been implemented in the GREEN STAR projects. In construction stage, some minor accidents and one major accident happened.

Mr. Bui Giang Nam wanted to assess the project safety plan and the safety management system of the project so we have information and experience for other projects in analyzing accidents happened in his company. His study focused on the specific objectives as follows:
1. Analyze the typical accident in the steel structure project;
2. Assess the project safety plan and safety management system; and
3. Propose recommendations for improvements safety management system

Conclusion

Most of the construction companies in Vietnam emphasize more on quality and productivity in terms of output. However, safety is one of the key measurements of good productivity which the people seldom realize. Through the analyzing of some accidents happened on the Green Start Project, the Safety plan was lack of some articles . The characteristic of ironworks are different and more dangerous from other works in construction . TT company should establish some procedures on the safety plan in future project

Following the Accident/Incident theory: Management of TT Company does not establish a comprehensive safety policy. Responsibility and authority with regard to safety are not clearly defined. Safety procedures such as measurement, inspection, correction, and investigation are ignored or given insufficient attention. Employees do not receive proper orientation. Employees are not given sufficient safety training or persons were trained on hazards and safe work procedures but not follow when performing the task.

Some problems of the Safety management system of TT Company :
- Unadequate commitment of top management
- Lack of Human resources for SMS
- Lack of Incentive and Reward

There are some key elements that can be the examples for other companies especially construction companies in Vietnam has written job description for each safety personnel on company and on site, provide safety training and record keeping which can be used as the document for safety measurement. Furthermore, there are written rules and regulations for each site personnel, safety committees to ensure the deployment of the safety plan, policy and programs.

Recommendation

TT Company should has some adjustments with their Safety management system such as:
1. Top manager should has commitment to supporting OH&S
2. Top manager commit to support OH&S. Establishing a Safety Management Organization with defined responsibilities of management staff as overall co-ordination and implementation of the Policy and the Safety Management System in the project

Besides financial supporting adequacy, top management staff have to realize their roles to play in safety. They should appreciate the communication between them and the frontline workers, which could impress the workers and thus improve the workers’ risk-taking mindset.

- Ensure that human resource is adequate for implementing and maintaining Safety Management System

TT company should recruit safety managers and safety supervisors for other projects in the future. The supervisor should provide the means to ensure that all workers are adequately instructed and trained , ensure that workers doing dangerous work have adequate training, experience and other qualities to carry out the work safely.

- Establish the incentive programme in order to motivate workers doing their jobs safely
• Behaviors required to achieve a safety reward should be specified and perceived as achievable by participants
• Everyone who meets behavioral criteria should be rewarded
• It is better for many participants to receive small rewards than for one person to receive a large reward
• Rewards should be displayable and represent safety achievement (I.e., coffee mugs, t-shirts, hats or jackets with a safety message)
• Contests should not reward one group at the expense of others
• Groups should not be penalized (lose rewards) for failure by individuals
• Progress towards achieving a safety reward should be systematically monitored and publicly posted

TT Company should also conducts Job Hazard Analysis which includes hazard identification and risk assessment to anticipate the hazard on site, the harshness of the consequences and the probability to happen. Moreover, TT company should also implement PPE program, accident investigation to reduce the probability of re-happening, emergency preparedness, safety promotion to induce the workers to work safely, evaluation of the subcontractor, health and welfare, security control, equipment inspection and waste material movement plan.

There are some key provisions of steel fabrication and erection when setting procedures for ironworks like: Cold stress; Heat stress; Lead exposure; Site Layout and Construction Sequence; Site-Specific Erection Plan; Hoisting and Rigging; Structural Steel Assembly; Column Anchorage; Beams and Columns; Open-Web Steel Joists; Systems-Engineered Metal Buildings; Falling Object Protection; and Training

Besides establishing appropriate safety procedures related with steel fabrication and erection Safety Policies of TT company should include:
1. The commitment of the top management to support OH&S. Ensure adequate supporting for implementing, maintaining and improving the SMS. To give Safety to be the highest priority and to inject safety consideration into every aspect of the Project
2. To recognize employees are the most important assets and to enrich their safety awareness by ways of Interactive Safety Training, Safety Promotion, Safety Meeting and Counseling.
3. To regular review, not least than once per year, the Policy, the Safety Management System for its efficiency and effectiveness by way of Management Inspection and Review and Safety Audit conducted by Senior Management Staff,
4. To maintain a high standard of safety performance and to the satisfaction of the Client at all time and also a progressively improvement in the standard achieved by continue monitoring and regular review.

His Thesis abstract is copied and posted.

Abstract

Safety in the fabrication and erection steel structure has always been a major issue. Wherever reliable records are available, steel construction is found to be one of the most dangerous on safety and health criteria, particularly in developing countries. Though much improvement in steel construction safety has been achieved, the erection steel structure still continues to lag behind most other activities with regard to safety. In developing countries, safety in fabrication and erection rules usually do not exist; if any exist, the regulatory authority is usually very weak in implementing such rules effectively. Further, work hazards at the construction workplace are either not perceived at all, or perceived to be less dangerous than what they actually are.

Most steel companies can give many good reasons why they want to implement management safety system. A well-designed safety management system can help to reduce injuries and illnesses and prevent risks and hazards. In addition, a good management system can increase efficiency, improve productivity and quality of services.

Through the assessment of some typical accident cases in steel construction of one project in LONG AN- The Green Star Factory, I want to assess the project safety plan and the safety management system of TT Company. Furthermore, I want to improve the existing safety management system of the company in order to prevent the accident happening in the future.

13 comments:

sampleletters said...

These people primary business is Fabrication and erection of structural steel.
In every MET-CON project, their goal is to deliver quality construction in strict conformance with the customer's requirements, in a timely, safe, and economical manner.
Construction job descriptions

Danielle said...

Safety of an employee should be considered as a first priority in a construction site. Lack of safety policy and standards will result in the increased number of injuries. Hence conducting a construction safety plan is a good idea.

Anonymous said...

Hi

I like this post:

You create good material for community.

Please keep posting.

Let me introduce other material that may be good for net community.

Source: Construction job descriptions

Best rgs
Peter

Carl Patten said...

Safety in the workplace is a must. More so in the steel fabrication and erection sector, since workers in this industry are dealing with huge construction materials at all times. The first step is to put together a sound safety protocol. Follow this up by educating your employees about said protocol from day one. Some form of monitoring system to this effect will also be helpful.

Barton Wilson said...

Thanks for sharing this one. I must agree that one of the things that every company should keep their focus on is the safety of their workers. Working with steel is quite dangerous that's why there should be precise knowledge about the task. And in one way or another, every firm should standardize their policy for the safety of their workers.

IsaRegistrar.com

TKL said...

Safety standards should be met before starting any construction project. Implementation of policies and strict wearing of safety equipment should be done first before anything else.

Unknown said...

I appreciate this blog post!
Steel is purchased by the steel fabricators, and is fabricated in accordance with the structural requirement of the project. Engineers, architects and steel manufacturers are working in collaboration today, to bring out the best in fabrication.

Hollis Asia

Emman said...

Safety is a must in every company, especially for the like of steel fabrication. TKL, in the Philippines is really good at steel fabrication and safety of its fabricators are their top priority. Click here to visit TKL

Anonymous said...

Proper construction site safety requires continual training and education. Every 6-12 months seems pretty standard.

Unknown said...

I know a company that produce all forms of steel fabrication with a great service.
Steel Fabrication

Unknown said...

wow I like it good and better usefull post .thanks for share this posting.

sheet metal industries faridabad

laya said...

I love this blog. Know the safety management is steel structure fabrication,Just check out, ms Chequered Plateare the best plates. You will get a large number of customers by affording a comfortable price.

Ganesh said...

Thanks for sharing...Structural Fabricators in Chennai