Seminar
STRATEGIC INFRASTRUCTURE DEVELOPMENT OF SOUTH EAST ASIA
STRATEGIC INFRASTRUCTURE DEVELOPMENT OF SOUTH EAST ASIA
On 11 Dec 2013, MPM program organized the seminar " Strategic Infrastructure Development of South East Asia", presented by Dr. Chotchai Charoenngam, Associate Professor,
Construction Engineering and Infrastructure
Management, School of Engineering and Technology, Asian Institute of Technology, Thailand.
South East Asian is considered of one of the fastest
growing region in the world. The demand of infrastructure development has been
rising much faster than the supply, especially entering AEC in 2015. Strategic
infrastructure needs to be developed to capture economic growth. Types of strategic infrastructure and its contribution to
national socio-economic development were presented during the seminar.

No comments:
Post a Comment