Tuesday 19 April 2011

CEIM open applications for August 2011 Intake.

We open the application for August 2011 intake for AIT Thailand campus. Limited numbers of scholarships are available for talented applicants. Some of the scholarships are Royal Thai Government scholarship, The King of Thailand scholarship, The Queen of Thailand Scholarship, Asian Development Bank scholarship etc.

What is CEIM? CEIM master and doctoral programs aim to prepare engineers to manage large construction projects starting from planning, design, tendering, construction and commissioning.

What will you learn? you will learn important knowledge and skills in project management in construction such as project planning/scheduling, project cost and financial management, organizational management, project contract, project risk, project quality management, project performance management and project financing.

Where will you work after graduation? You can work in strategic industries that highly need project management such as:
- Contractors (highway, building, oil/gas and energy)
- Consultants
- Property and real estate developers
- Bank and Invesment companies
- Public Private Partnership Consortium
- Financial and Banking institutions that lend fundings for construction projects
- hotel and apartment development
- oil and gas construction

What else will you learn during your study with us in AIT?
AIT is a very multicultural insitute. Our students and faculty members come from different parts of the world such as Thailand, Vietnam, Bangladesh, India, Taiwan, Pakistan, Indonesia, China, Korea, European Union. Aside from studying knowledge, you will also learn different cultures and different ways of thinking from your friends; and develop your global international networking.


Please contact CEIM Secretary (Ms. Woranuch, phone 025246060 or email woranuch@ait.ac.th) for further information.

Visit CEIM: http://www.set.ait.ac.th/ceim
How to apply? http://www.ait.ac.th/AIT/admissions/admissions


Regards
Dr. BHW Hadikusumo
Associate Professor
CEIM Coordinator
MPM Coordinator

Friday 4 March 2011

AITCV students visit AIT main campus in Thailand

The AITCV Students from Hanoi and Ho Chi Minh City arrived on February 26 for a week-long site visits, lectures and field trips. They will be here in Thailand until March 6, 2011.



In this photo: 1st Row (L-R): Mr. Bui Viet Thi, Mr. Tran Xuan Canh, Mr. Tran Viet Sinh, Mr. Nguyen Nam Cuong, Dr. Theerathon Tharachai, Dr. BHW. Hadikusumo (MPM&CEIM Coordinator), Dr. Nitin Afzulpurkar (SET Dean), Prof. Said Irandoust (AIT President), Prof. Joydeep Dutta (AIT Vice President for Academic Affairs), Mr. Noppadol Jaisue, Dr. Oulawan Kulchartchai, Ms. Kieu Phuong Ly, Ms. Nguyen Thi Thu Nga, Ms. Tran Ngoc Bich Tram, Mr. La Nguyen Bao.

2nd Row (L-R): Mr. Pham Viet Cuong, Mr. Chau Anh Tuan, Mr. Tran Minh Nghia, Mr. Vu Van Tinh, Mr. Bui Thanh Nam, Mr. Nguyen Trong KHoa, Mr. Nguyen Nhat Tai, Mr. Ngo Quoc Thai, Mr. Nguyen Thai Son, Mr. Tu Thien Tu, Ms. Phan Hong Ngoc, Ms. Dang Trinh Thanh Phuong, Miss Junya Phuangphay, Miss Huyen Thanh To, Mr. Vuong Hoang Thang, Mr. Pham Quang Cuong, Mr. Tran Phi Long, Mr. Thanapon Buaklom, Ms. Woranuch Chumchat, Mr. Ngo Hoang Linh

3rd Row (L-R): Mr. Nguyen Duc Huan, Mr. Nguyen Thanh Tung, Mr. Huynh Thanh Quang, Mr. Nguyen Anh Khoa, Mr. Ngo Thanh Duc, Mr. Hoang Manh Chi, Mr. Nguyen Viet Cuong, Mr. San Visal, Mr. Le Quang Son, Mr. Vo Khac Kien, Mr. Nguyen Hong Thanh, Mr. Puoy Puthitha, Mr. Hout Venghong, Mr. Nguyen Thanh Tam, Mr.Senjam Romero Singh

Tuesday 11 January 2011

CEIM-SET Congratulates the Graduates of 114th Batch

We would like to congratulate the new graduates who received their diploma during the 114th AIT Graduation Ceremony on December 17, 2010. The names of graduands and their Thesis/Project title are listed below:

DOCTOR OF PHILOSOPHY DEGREE (CEIM)

1. Rajwanlop Kumpoopong
A Hybrid Stochastic/Mechanistic Model for Determining Bridge Condition Rating

MASTER OF ENGINEERING DEGREE (CEIM)

1. Kittichai Kanjanakantika
Risk Factors Affecting Business Diversification in a Real Estate Company

2. Vuong Hai Khoa
Supply Chain Management: A Case Study of Construction Companies in Vietnam

3. Tinn Withayawaragul
Relationship Between Project Phases and Stock Performance: A Study in Stock Exchange of Thailand (SET)

MASTER OF ENGINEERING DEGREE (PROFESSIONAL)
(Area of Specialization: Project Management in Construction)

1. Nguyen Chau Dieu An
Project: A Critical Appraisal of Briefing Clients in the Construction Process: A Case Study of Residential Project

2. Hoang Thi Hai Anh
Project: Risk Management in Price Adjustment Contract: A Case Study of a Construction Project in Vietnam

3. Dang Tuan Anh
Project: Risk Management of Basement Construction Affecting Adjacent Buildings: A Case Study of Construction Project in Ho Chi Minh City, Vietnam

4. Truong Thai Binh
Project: Owner's Involvement in the Preliminary Stage of Real Estate Development: A Project Case Study in Vietnam

5. Nguyen Phan Hoa Binh
Project: Integrated Project Management Assessment for a Development Property Project at the Capital Fund in Vietnam

6. Le Nam Binh
Project: Owner's Project Schedule Management for High-Rise Office Building Projects: A Case Study of the Construction Project of Petrovietnam Finance Centre in Danang City

7. Nguyen Hung Cuong
Project: Delay in Planning, Design and Construction: A Case Study of Residential Development Project in Ho Chi Minh City

8. Le Ngoc Diep
Project: Risks Affecting Construction Cost in Vietnam

9. Do Tran My Thuy
Project: Risk Management in the Design of Large-Scale Construction Projects: Case Studies of an Urban Area and a Highrise Building Project

10. Truong Ngoc Dung
Project: Effectiveness of Feasibility Study Analysis in an Apartment Building Project: A Case Study of a Two Towers-Twenty Six Storey Apartment Project in Ho Chi Minh City

11. Nguyen Duy Thien Giang
Project: Claim Management and Analysis: Case Study of a High Rise Building Project

12. Trinh Thi Thu Ha
Project: Environmental Impacts Assessment in Nam Ly Bridge - Ho Chi Minh City, Vietnam

13. Vo Si Hoai
Project: Schedule Planning and Control in an Engineering, Procurement and Construction Project: The Case of a City Hall Project

14. Le Quang Khanh
Project: Owner's Organization Project Management Maturity: The Case of Petrolimex Saigon

15. Nguyen Trung Kien
Project: Project Owner's Quality Management System - The Case of Sails Tower Project

16. Tran Thanh Liem
Project: Project Management Life Cycle and Risk Management in a New Residential Development Project in Vietnam: The Case Study of the Fifth Street New Residential Project (D2D's Company) and its Secondary Project (Berjaya-D@D Join Venture Company)

17. Nguyen Cao Bao Luat
Project: Design Management in a Design-Build Project Based on the Design Team of Contractor Perspective

18. Vo Dinh Nguyen
Project: Project Management Practice in a Small and Medium Vietnamese Contractor: The Case of Nhat Dang Company

19. Do Huu Phuoc
Project: Owner's Project Life Cycle Approach: The Case of Rubber Plantation Project in a Vietnam Rubber Company

20. Tran Duc Quang
Project: Project Organizational Structure Roles and Responsibility - The Case of Marriott Five-Star Hotel

21. Chona Salvatus Salvahan
Project: Minimizing the Impact of Change Order to Project Costs

22. Nguyen Duy Duc Thu
Project: A Feasibility Study of a Curtain Wall Testing Company in Hanoi

23. Nguyen Le Thuan
Project: Owner's Project Control Strategy

24. Le Mien Thuy
Project: Method and Effectiveness of a Feasibility Study for an Apartment Project: The Case of Carina Plaza Building

25. Nguyen Thu Trang
Project: Application of Fidic Contract in a Bridge Project: The Case of Can Tho Bridge

26. Tran Thi Thien Trang
Project: Assessment of Risks on the Design Management Aspects in Luxury Hotel Development Projects: The Case of Le Meridien Saigon Hotel

27. Nguyen Duc Trong
Project: Organizational Project Management Structure in a Real Estate Developer Company: The Case of Namlong Corporation

MASTER OF SCIENCE DEGREE (PROFESSIONAL)
(Area of Specialization: Project Management in Construction)

1. Mr. Nguyen Duc Thanh
Project: Risk Factors in Vietnam Power Plant Projects: A Case Study of Nhon Trach Power Plant and Camau Gas Power Fertilise Projects

2. Tran Van Trung
Project: The Delay Factors in EPC Contracts in Vietnam: The Case of Uong Bi Thermal Power Plant

3. Mr. Vo Quoc Vinh
Project: Contractual Risks of SME Contractors - A Case Study a of Mechanical and Electrical Contractor

Thursday 16 September 2010

AIT Thailand August 2010 Intake for CEIM and MPM fields of Study

The AIT in Thailand accepted 49 students for August 2010 semester. The distribution of students enrolled in the Doctoral, Master and Professional Master Programs are 3, 9 and 37 respectively.
Below are names of the current students:

No. Name Degree

1. Mr.Grit Ngowtanasuwan, CAS
2. Mr.Wilson Udo Udofia, Doctor
3. MissSarsinatt Kriwaphun, Doctor
4. Mr.San Visal, Master
5. Mr.Ranjeet Sandeep Pundlik, Master
6. Mr.Senjam Romero Singh, Master
7. Mr.Krisana Juanwanpen, Master
8. Mr.Thanawat Phangchunun, Master
9. Miss Junya Phuangphay, Master
10. Mr.Pham Quang Cuong, Master
11. MissHuyen Thanh To, Master
12. Mr.Tran Phi Long, Master
13. Mr. Nguyen Duc Huan, MPM
14. Ms. Nguyen Thi Minh Ha, MPM
15. Mr. Nguyen Nhat Tai, MPM
16. Mr. Ngo Quoc Thai, MPM
17. Mr. Le Van Tuan, MPM
18. Mr. Nguyen Huu Ky, MPM
19. Mr. Vo Thanh Phong, MPM
20. Mr. Nguyen Ngoc Thi, MPM
21. Mr. Bui Duy Khanh, MPM
22. Mr. Nguyen Thai Son, MPM
23. Mr. Tran Minh Nghia, MPM
24. Mr. Le Anh Thai, MPM
25. Ms. Dang Trinh Thanh Phuong, MPM
26. Ms. Nguyen Tran Tuong Ly, MPM
27. Mr. Le Do, MPM
28. Mr. Nguyen Chanh Trung, MPM
29. Mr. Nguyen Nong Truong Thanh, MPM
30. Mr. Vo Khac Kien, MPM
31. Mr. La Nguyen Bao, MPM
32. Mr. Tu Thien Tu, MPM
33. Mr. Hoang Manh Chi, MPM
34. Mr. Chau Anh Tuan, MPM
35. Nguyen Thi Thu Nga, MPM
36. Mr. Ngo Thanh Duc, MPM
37. Nguyen Trong Hung, MPM
38. Mr. Bui Viet Thi, MPM
39. Mr. Nguyen Anh Tuan, MPM
40. Mr. Vu Van Tinh, MPM
41. Mr. Bui Thanh Nam, MPM
42. Mr. Huynh Thanh Quang, MPM
43. Mr. Do Danh Chi, MPM
44. Phan Hong Ngoc, MPM
45. Vu Kim Dien, MPM
46. Tran Cao Hy, MPM
47. Nguyen Trong Khoa, MPM
48. Nguyen Hong Thanh, MPM
49. Mr. Ha Chi Nghia, MPM

Tuesday 1 June 2010

CEIM-SET Congratulates Its New Graduates

We would like to congratulate the new graduates who received their diploma during the 113th AIT Graduating Ceremony on 26 May 2010. The names of graduands and their Thesis/Project title are listed below:

Doctor of Philosophy Degree (CEIM)

1. Dr. Oulawan Kulchartchai, Development of a Worker Engagement Measurement Tool (WEMT) for a Construction Safety Program

Master of Science Degree (CEIM)

1. Mr. Mohammad Sharif, Implementation Problems Causing Cost Overrun Of The World Bank-Suppoerted Project, A Case Study In Afghanistan

2. Mr. Tanatat Wisetsurakarn, The Construction Litigation Analysis: A Case Study Of The Thai Supreme Court Cases

3. Mr. Amnarch Pirmsinthavee, Relationship Marketing In Thai Sme Contractors: A Case Study Of Bangkok And Khonkaen Sme Contractors

4. Mr. Raj Kumar Lakhe, Asset Management In Public And Public Private Partnership (PPP) Hydropower Stations In Nepal

5. Mr. Adithep Roobleak, Cultural Dimensions Of Construction Engineers In Thailand Related To On-Site Management

6. Mr. Truong Ngoc Quy, Current Practices Of Public Private Partnership In Low-Income Housing Development In Vietnam

7. Mr. Aung Chan Thar, Web Application For Contractor Claim Analysis

8. Miss Truong Thi My Thanh, Success Factors For Financial Sustainability Of Tool Road Project In China

9. Ms. Saw Sandar, Assessing Project Management In Myanmar Construction Companies

10. Ms. Truong Thi Van Anh, Special Purpose Vehicle I N Too-Road Project Development : A Case Study Of The National Highway 14 Project In Vietnam

11. Mr. Nguyen Xuan Phong, Owner's Contract Administration For Project Time And Cost Control Strategy In Comercial Building Projects

12. Mr. Duong Thanh Hai, Improving Quality Assurance In Construction : Cantho Storage Tank Capacity Enhancement Project Case Study, Vietnam

13. Miss Bich Ngoc Nguyen, Application Of Portfolio Resource Management For Construction Contractors In Vietnam

14. Mr. Le Dang Thuc, Investigation Of Change Order Management: A Case Study Of Oil & Gas Projects

Professional Master Degree (MPM)

1. Mr. Vu Van Ngu, Subcontractor Management In LPG Truck Loading Projects

2. Ms. Phan Thi Hai Giang, Sub-Contractor Management In Gas Projects: A Case Study Fo Pvgas Gas Distribution Centre Project

3. Mr. Trieu Quoc Tuan, Risk Management In Pipeline Operation Management: A Case Study Of Petrovietnam Gas Pipeline System

Monday 11 January 2010

Professional Masters in Project Management and CEIM Graduation Photo


Dear All


MPM2 Vung Tau, MPM2 HCM, MPM1 Hanoi and PETRAIT and CEIM programs finally received their degree in December 2009 in AIT Main Campus Thailand.

Everybody look very happy in the photo.

Congratulations!

The name of the graduants and project case study topic:

Name - Thesis or Project Case Study Title

Nguyen Van Tam - Claims in Building Project in Public Sector ; Case Study in Mekong Area, Vietnam.

Karma Gyamtsho - Collaboratie Strategy Between Stakeholders of Hydropower and Power Intensive Industry in Bhutan.

Sonam Tobgay - Construction Claim Types and Causes: A Study of Tala Hydroelectric Project, Bhutan.

Willy Sanjaya - The Characteristics of Innovative Construction Project: A Study in Thailand Construction Industry.

Andi Sanjaya - Strategy in Working Capital Management under Adverse Economic Condition: A Case Study of Indoesia Construction SMEs.

Dang Dinh Lam - Design Management for Architectual Project: A Case Study of PVMTC-Petrovietnam Building Project.

Phan Vu - The delay factors in building construction stage - a case study of office builing in HCMC., Vietnam

Tran Thi Nguyen Cat - THE COMMUNICATION IN DESIGN PROCESS BETWEEN THE EMPLOYERS AND CONSULTANTS

Phan Hong Hoan - Factors causing delay in construction project - a case study of commercial construction project in HCM city

Le Hoai Viet - APPLICATION OF PROJECT MANAGEMENT FUNCTIONS IN SMALL CONSTRUCTION COMPANIES: CASE STUDY OF SMALL CONTRACTORS IN HOCHIMINH CITY

Nguyen Canh Toan - COMMUNICATION MANAGEMENT WITHIN CONSTRUCTION PROJECT TEAM: A CASE STUDY OF CONDOMINIUM PROJECT IN HO CHI MINH CITY

Le Khac Bao - The Construction Logistic for pre engineering building (PEB) construction

Bui Van Cuong - PRACTICES OF CONTRACTOR OF SCHEDULE/COST PLANNING AND CONTROL - A CASE STUDY OF RESETTLEMENT HIGH-RISE BUILDING PROJECT IN HO CHI MINH CITY

Nguyen Phong - Matrix structure in small scale & fast track construction project - A case study of fitting out & interior project

Bui Giang Nam - Focus on Fabrication and Erection of Steel Structure

Tran Hong Quan - Project Owner’s Quality Management System – A case study of Estella Residential Development Building Construction Project

Nguyen An Khe - SOME CASE STUDIES COMPARING THE ROLE OF ENGINEER BETWEEN VIETNAMESE AND FIDIC CONTRACT

Hoang Ngoc Anh Focus on Risk in New Urban Infrastructure Development Project

Nguyen Thi Thanh Truc CLAIM MANAGEMENT AND ANALYSIS CASE STUDY OF HYDROPOWER PLANT

Nguyen Hoang Anh Chuong In New Residential Development Project ; Focus on Cost and Financial Management

Nguyen Huynh Trung Hai GREEN BUILDING : ISSUES, APPROACHES AND IMPLEMENTATION.

Nguyen Duc Hung Project delay in machenical factory construction project

Nguyen Huu Phuc Project Materials Management for Telecom steel Towers erected project in Vietnam

Hoang Don Dung Safety and Quality Management for Construction Temporary Structure with Reference of Construction Regulation and Contract in Vietnam.

Pham Thi Ngoc Hien Cash flow projection management in small – medium sized Vietnamese Contractor

Nguyen Anh Kiet QUALITY MANAGEMENT IN DESIGN PHASE OF CONSTRUCTION PROJECT

Mr.Truong Quang Dien Delays in construction project in Vietnam, causes and effects

Mr. Hoang Huu Cam A case study of delay in commissioning actitvity of Phu My Gas Distribution Center Project, Vietnam

Mr. Tran Dang Thuyet Owner’s EPCI Contract Management for Oil and Gas Development Projects – A Case Study of Vietnam Oil and Gas Project

Mr. Pham Xuan Thinh Some main factors affecting quality of construction projects- A case study of Expanding phase III port – Petroleum technical service base in Vung Tau, Vietnam

Mr. Le Van Thong Quality management in construction project

Mr. Do Van Hanh Contract management-how owner can responsible to change order in Oil and gas project management

Ms. Pham Thi Thuy Giang Subcontractor management of pipeline construction project

Mr. Phan Tuong Liem Engineering, procurement, construction (Epc)contract management- Case study: epc contract management for rang dong full field development block 15-2 offshore vietnam

Mr. Tran Tuan Binh Quality Management and soil improvement of PVMPC

Mr. Nguyen Sinh Khang Owner's Project cost management approach: A Case study of underground oil storage cavern project in Vietnam.

Mr. Dang Viet Cuong "FACTORS INFLUENCING TO BENEFIT OF PROJECT
A CASE STUDY OF PETROVIETNAM HOTEL
COMPLEX PROJECT"

Ms. Pham Minh Nga "Integration of Gas Gathering System in Oil Field Development Project
A solution for Offshore Oil Field Early Development - CASE STUDY: GAS PIPELINE SYSTEM FOR BLOCK 16-1 TGT FIELD &
15-2/1 HST – HSD FIELD DEVELOPMENT


"

Mr. Nguyen Dinh Duong DELAYING CAUSES IN SUB-PROJECTS OF THE HO CHI MINH NATIONAL HIGHWAY CONSTRUCTION PROJECT

Mr. Tran Dang Manh Customer-driven strategy and KPIs using CRM approach- a case study of construction enterprises in Vietnam

Mr. Bui Tien Dung "CONTRACT CLAUSES IN EPC thermal power PROJECTS - A CASE STUDY OF Hai phong thermal power PROJECT
"

Mr. Pham Quoc Hung QUALITY MANAGEMENT SYSTEM FOR MANUFACTURER AND CONTRACTOR OF PRE-CAST PILE FOUNDATION

Ms. Nguyen Thi Thu Huong DELAY CAUSES IN THE CONSTRUCTION OF THE REFINERY PROJECTS IN VIETNAM– A CASE STUDY ON THE DUNG QUAT REFINERY PROJECT.

Mr. Vu Dinh Duy "CONTRACT CLAUSES IN EPC CONTRACT - A CASE STUDY OF DINH VU POLYESTER PROJECT, HAI PHONG, VIETNAM
"

Mr. Le Tu Anh "MARINE FACILITY DESIGN AND ITS IMPACT TO PROJECT COST IN
REFINERY PROJECT -A CASE STUDY OF NGHI SON REFINERY AND PETROCHEMICAL COMPLEX PROJECT
"

Mr. Dinh Van Ngu "MANAGING THE PRECOMMISSIONING AND
COMMISSIONING PHASE IN EPC CONTRACT
A CASE STUDY OF DUNG QUAT REFINERY PROJECT, QUANG NGAI, Vietnam
"





Regards
Hadikusumo

Tuesday 3 November 2009

Professor Ali Jaafari Gives Lecture at AIT

Dr. Ali Jaafari, Professor and President of the Asia Pacific International College was invited to be the Speaker at the seminar held in AIT on 27 October 2009. The theme of this seminar is “The making of Professional Managers and Leaders: How to succeed on the Face of a Fast Challenging World”. This was attended by Dr. B. H. W. Hadikusumo, Associate Professor and Coordinator, CEIM-SET, some AIT staff and around 35 Ph. D. and M. S. Students of CEIM Field of Study.

About the Lecture

ABSTRACT

Professional people face different career paths to those of the past, when relative certainty and continuity were the norm. The socio-economic and political environments have changed to complex or even chaotic state and continue to challenge even the most hardened managers. Projects and programs have risen in complexity too, due to complex environments, changing goals and conflicting interests. Knowledge increases at a rapid rate and affects all fields of activity. In this environment a normative model of thinking and practice, based on best practice models, can no longer be the foundation of professionality in most fields of endeavour. In this presentation the author will attempt to respond to the following key questions and to raise the level of debate on professional development and practice as well as the role of educational institutions:
 What characterises the contemporary environment within which business, projects and endeavours take shape?
 What are the business and social drivers and how do these affect organisations in both public and private sectors?
 What are the implications for professional people?
 Why is it necessary to promote and apply a new model of professionalism along the concept of transformative leadership?
 Who are creative-reflective professionals, and what characterises them?
 How relevant are these concepts to professionals, classed as techno-management professionals?

The thesis advanced by the author is that most graduates taught under a normative model cannot cope with a fast changing world nor perform professionally well despite all that training that goes to their preparation. They need additional and systemic preparation to develop different competencies and cognitive abilities that will aid them survive or even thrive in an environment of change and uncertainty. This thesis gave rise to the establishment of Asia Pacific International College (APIC) as a unique institution that aims to help both fresh university graduates as well as mature age professionals to acquire new resilience and abilities to rise above the complex challenges facing them. A major pillar of such development is leadership and transformative capabilities.

Photos during the Seminar




























Speaker’s Biography:

Professor Jaafari is a distinguished educator and consultant, recognised internationally, particularly in management of large complex projects and programs. He has delivered courses and training workshops for more than 3500 professionals and executives globally, including many multi-national corporations, EPC firms, major public and private sector organisations, and government agencies. Professor Jaafari has published widely in major international journals and conferences, books and monographs. He currently heads Asia Pacific International College. He held the Chair of Project Management at the University of Sydney until August 2004. Professor Jaafari has an extensive professional track record in this field and is known as an authority internationally.

Monday 2 November 2009

Prof. Peter Barrett gives lecture on “The important place of construction in the economy (using results from the revaluing construction work)”

The School of Engineering and Technology (AIT Thailand) conducted a seminar with the theme “The important place of construction in the economy (using results from the revaluing construction work)” last 19 October 2009. Professor Peter Barrett was invited to be the guest speaker for this event. Prof. Barrett is currently Professor in Construction and Property Management of the University of Salford.

Dr. Chotchai Charoenngam, Associate Professor, CEIM-SET and around 40 Ph. D. and Master Students attended this event.




Prof. Peter Barrett and Dr. Chotchai Charoenngam after the lecture.



Group photo : Prof. Barrett and Dr. Chotchai (center) together with CEIM staff, Ph. D. and M. S. students


About the Speaker
Peter is President of the UN-established International Council for Research and Innovation in Building and Construction (CIB) involving 2000 experts in 60 countries. He is a past Director of Salford’s top rated, 6* Research Institute for the Built and Human Environment and is currently Chairman of the £5M EPSRC funded, Salford Centre for Research and Innovation. From 2001 - 2008 Professor Barrett was Pro-Vice Chancellor for Research with overall responsibility for all research across Salford University, which in this period grew from involving 38% to 60% of academic staff. See Research and Graduate College,Peter is a Fellow of the Royal Institution of Chartered Surveyors and in 1989 was the first Chartered Building Surveyor to gain a PhD. He has since supervised and supported a wide range of Post Graduate students. To date he has produced over one hundred and seventy single volume publications, refereed papers and reports, and has made over one hundred and ten presentations in around sixteen countries. Professor Barrett has undertaken a wide range of research, typified by a management focus around real world problems using a range of hard and soft research methods. He is currently focusing on the theme of Revaluing Construction with a particular interest in the links between Senses, Brain and Spaces.

Wednesday 2 September 2009

Construction, Engineering and Infrastructure Management (AIT Thailand) August 2009 Intake

The Construction, Engineering and Infrastructure Management field of study accepted 16 applicants for Masters Program and 1 applicant for Ph. D. for August 2009 semester.


No - Name - Degree - Country

1. Mr.Asmat Nabi Hotaki - Master - Afghanistan
2. Mr. Hout Venghong - Master - Cambodia
3. Mr. Puoy Puthitha - Master - Cambodia
4 . Mr.Timo Juhappeka Myllynen - Special - Finland
5. Ms. Kyawt Phyu Phyu - Master - Myanmar
6. Mr. Kyaw Min Thu - Master - Myanmar
7. Mr. Pye Phyo Moung - Master - Myanmar
8. Mr. Mukesh Khadka - Master - Nepal
9. Mr.Hassan Ashraf - Master - Pakistan
10. Ms. Supatchana Pumpipat - Master - Thailand
11. Mr.Janeyut Naiyarat - Master - Thailand
12. Mr.Wattanachai Tanjedreu - Master - Thailand
13. MissPorntanat Kongsrisawat - Master - Thailand
14. Mr.Thanapon Buaklom - Master - Thailand
15. Mr.Kittawat Sukosi - Certificate to Master - Thailand
16. Ms. Mai Tuyet Vu - Master - Vietnam
17. Mr. Somjiat Sudprasert - Doctor - Thailand

Tuesday 3 June 2008

Professional Master in Project Management Students from Vietnam came to AIT for one month Intership

30 students from Professional Master in Project Management came to AIT Thailand for one month internship and field trip. They stayed at AIT Thailand from 1 to 31 May 2008.

During the internship, the professional master students took three courses on applied project managements, preparing their project report. The three courses are
(i) applied project management in industrial complex which was taught by Mr. Burin K (Country Manager of Bovis Lendlease Thailand)
(ii) Applied Project Management in Oil and Gas Pipeline which was taught by Mr. Michael Sypsomos (Project Director of Chevron Thailand)
(iii) Applied Project Management in Oil Refinery Project which was taught by Mr. Chalermchai U. (Project Director of Bangchak Oil Refinery).

Regards
Hadikusumo

Project Director of Chevron lectured at AIT CEIM













Mr Mike Sypsomos, Project Director of Chevron Thailand gave a 15 hours lecture at AIT CEIM on "Applied Project Management in Oil and Gas Projects" on May 2008.


Day 1-
9:00 to 11:30am – Project description, definition, WBS, PEP, exercise and discussion
11:30am to 12:15pm – extended break for lunch
12:15pm to 4:00pm – Project Controls (Schedule & cost management, resources, estimate, progress, EV), exercise and discussion of Lessons Learned

Day 2-
9:00 to 11:30am – Risk Management (plan and implementation), Contract/ Procurement management and exercise
11:30am to 12:15pm – extended break for lunch
12:15pm to 4:00pm – PMI Project of the Year – Lessons Learned from a “world class” project & exercise. FEL, Project Audit and PM Maturity Model, Team Building, Coaching and other VIPs and best practices

Saturday 15 March 2008

CEIM join AIT Team to Afghanistan 8-15 March 2008





Dear All

Dr. BHW Hadikusumo joined AIT Team to Afghanistan. The mission of this business trip was to assess the Departments of Balkh University including the Department of Construction.

We arrived in Kabul on Sunday 9 march and continued 7 hours surface travel to Mazara-e Sharif where Balkh University is located.

During the assessment, we really appreciate the cooperativeness of Balkh University's faculty members who really shared to us their actual situation. AIT will assist them to develop a modern curriculum and lab equipment and help the faculty members to implement the curriculum.

Bad and Good news. On our way back to Bangkok, Dr. Hadi and Dr. Guha (from computer science) went to Kabul Airport on Thursday morning 13 March. The Bad news is just before we arrived at the airport, the airport car park was blasted by suicide car bombing. The good news is i can still write this blogspot which means that we were very lucky that we came quite late to the airport because we enjoyed breakfast and chatting at the hotel and waiting the check-out process. Afghan newspaper reported that 8 people were killed during the massive bombing. This bombing happened just one day after the US Military stated that Afghan government controls only 30% of the territory.

Detail of the news can be read from http://www.afghannews.net/index.php?action=show&type=news&id=2715

By the way, Afghanistan is a very beautiful country with high mountain and snow. From Kabul to Mazar-e Sharif, we passed SALANG, a very beautiful landscape.

I upload the photos for you ....

Regards

Posted by
Dr. BHW Hadikusumo
CEIM Coordinator
http://www.set.ait.ac.th/ceim/

" CEIM offers Master and Doctoral degrees in Construction Project Management and Infrastructure Management in Indonesia, Thailand and Vietnam "

Allan Tannaya works at Consultant Dispute Resolution in California

Dear All

I received an email from Mr. Allan Tanaya as below. He is one of our alumni joining PETRAIT (Petra Surabaya Indonesia and AIT) program. He graduated in May 2007, then he went to USA.

++++++++++++++++++++++++++++++
Dear Dr. Hadi,

I hope you are doing very well. Currently, I am in Carlsbad, CA, USA, working for CDR Consultants as a Project Consultant, which responsible to perform support work for construction dispute claims analysis, construction project execution, CPM scheduling, and Construction project execution.
CDR company provides an array of project management and construction management consulting services with four operating divisions, Project Risk Management, Construction Dispute Resolution, Management Consulting, and Training and Education.

If you need more detail regarding this company, you can go to their website http://www.cdrconsultants.com/.

Have a great day

Regards,

Allan Tannaya.
++++++++++++++++++++++++++++++

I wish you successfull with your career in the US.

Note: if you would like to know Alan's email address, please contact me.

Regards

Posted by
Dr. BHW Hadikusumo
CEIM Coordinator
http://www.set.ait.ac.th/ceim/

" CEIM offers Master and Doctoral degrees in Construction Project Management and Infrastructure Management in Indonesia, Thailand and Vietnam "

Wednesday 30 January 2008

CEIM welcomes 9 new students joining Jan 2008 Semesters

CEIM welcomes 9 (nine) new students joining AIT/CEIM master and PhD program in January 2008. The nine students come from Taiwan, Vietnam, Bhutan and Iran as follows:
- one PhD student from Taiwan, Mr. Kang Ning Fu
- one PhD student from Iran
- Five master students from Vietnam
- two master students from Bhutan

Posted by
Dr. BHW Hadikusumo
CEIM Coordinator
http://www.set.ait.ac.th/ceim/

" CEIM offers Master and Doctoral degrees in Construction Project Management and Infrastructure Management in Indonesia, Thailand and Vietnam "

Wednesday 16 January 2008

CEIM is expanding into Property and Real Estate Development

CEIM is expanding into Property and Real Estate Development area. We are now recruiting a new faculty member in the area of property/real estate financing, market analysis and valuation. The new faculty member will create a synergy with the existing two faculty members who are in project management area. The existing two faculty members will teach subjects related with property and real estate project management, while the new faculty will teach property and real estate business related subjects. In addition, Dr. Roland may also help us in teaching Property Law.

In order to launch an attractive program, we have discussed with a "Property Consultant" for co-branding between CEIM and the "Property Consultant".

We hope to launch the new program on Sept 2008 or January 2009.

Posted by
Dr. BHW Hadikusumo
CEIM Coordinator
http://www.set.ait.ac.th/ceim/

" CEIM offers Master and Doctoral degrees in Construction Project Management and Infrastructure Management in Indonesia, Thailand and Vietnam "

CEIM Thailand is Back to School

AIT/CEIM students BATCH Year 2007 started their second semester today 16 January 2008. In this January semester, they can choose to take four to five courses offered by CEIM Field of study as follows:
  • Project Financing by Dr. Chotchai
  • Project Performance Management by Dr. Chotchai
  • Occupational Safety and Health in Construction by Dr. BHW Hadikusumo
  • Legal and Contract Risk Management by Dr. Roland
  • Infrastructure Management by Dr. Puvadol
  • Note: in this semester, IT in Construction course will not be offered.
In this January 2007, six (6) Two-Phase CEIM students from Vietnam will come to study in AIT/CEIM Thailand.

Welcome back to school!

Posted by

Dr. BHW Hadikusumo
CEIM Coordinator
http://www.set.ait.ac.th/ceim/

" CEIM offers Master and Doctoral degrees in Construction Project Management and Infrastructure Management in Indonesia, Thailand and Vietnam "

Monday 14 January 2008

CEIM Thailand is organizing a site visit field trip to Phuket at the End of Jan 2008

Dear All

As part of our curriculum in which students have to interact with the industry, CEIM is organizing a site visit to Phuket to see many luxurious resort projects at the end of Jan 2008.

K. Weerayudh is volunteering to organize this important and exciting event.

Junior students will have to attend this site visit trip and Senior students are also welcome to join.


I will follow up with the real story from site visit on my next report!



Posted by

Dr. BHW Hadikusumo
CEIM Coordinator
http://www.set.ait.ac.th/ceim/

" CEIM offers Master and Doctoral degrees in Construction Project Management and Infrastructure Management in Indonesia, Thailand and Vietnam "

Three PhDs graduated on Dec 2007

Dear Dr. Thanet Aksorn, Dr. Martinus Abednego and Dr. Piyanut W.

After your serious and tedious works, finally you are able to complete your PhD degree which is the highest degree in education.

CEIM wishes you success in your future career and life.