Friday, 22 February 2013

PROFESSIONAL MASTER PROGRAM IN PROJECT MANAGEMENT SPECIALIZED IN CONSTRUCTION (MPM) Intake 2013



PROFESSIONAL MASTER PROGRAM IN
PROJECT MANAGEMENT SPECIALIZED IN CONSTRUCTION (MPM) Intake 2013




Introduction
 The Project Management in Construction field of study trains professionals to play a leading role in the international construction industry. It molds students to become active leaders in the construction industry and large construction project.  The program prepares for students:

-    To become outstanding managers and decision-makers familiar with the modern techniques  of construction management, engineering management and infrastructure management.

-    To more competent and capable to manage international large construction projects

-    To be able to assist the corporation to install and develop project management system in a company


 Main Features of the Program
•       One year professional AIT Master’s degree.
•       Credits can be accumulated over two years
•       Certificate course works
•       International field trip to the large construction sites in the region
•       Study language: English.

Program Structure
 AIT Professional Master Program is designed for those engineers who cannot leave their work while following a master program. The program is conducted in one year. To complete the master program, participants need to complete 11 courses and 1 project report with total 33 credits.

In the first two semesters, students will take basic and advanced courses selected in consultation with an academic/thesis advisor from among the regular courses offered at AIT. During the third semester, students will carry out their project study. Students will conduct international field trips:

-          First trip: Study at AIT

-          Second trip: visit to the large construction sites outside Vietnam, such as Thailand, Singapore, Malaysia, Indonesia, China and Taiwan or do internship in AIT Thailand

-          Third trip: to AIT to attend Graduation ceremony
AIT certificate can be given for those students who would like to register for a course offered of the AIT Professional master program. Credits gained from certificate courses can be transferred to AIT Professional Master Program.



English Entry Requirement
 AIT is an international institute with English as the sole language of instruction. Admission to AIT requires proof of English language proficiency which may be satisfied in any requirement of the following:
·                     IELTS (4.5)
·                     TOEFL (Paper -based: 500; Computer - Based:173; or Internet - based: 61)
·               AITEET. Applicants can apply for English Test offered by AIT at AIT-VN. English Test fee:  420,000 VND.

Entry Requirements
 To be eligible for admission to the AIT Professional master's program, an applicant must:
·              Hold a Bachelor degree (normally from a four-year program), or its equivalent, in an appropriate field of study.
·                     Have undergraduate grades significantly above average.
·                     Have good command of English
·                     At least three year of working experiences
Application form can be downloaded at www.aitcv.ac.vn . Application submission fee:  420,000 VND. This fee is paid to AITCV when applicants submit the application documents.

Teaching Schedule
 The program is conducted during non-working hours (weekends and evenings)


Faculty  
 Faculties are from Construction Engineering and Infrastructure Management (CEIM) program – AIT and professional experts from industry. CEIM is highly experienced in project management education, from short training programs to master programs, doctoral programs and post-doctoral programs. So far, there are more than 300 masters and 12 doctors graduated in Project Management program and more than 500 trainees from short training programs received certificates offered by CEIM. CEIM also have its strong partnership with government’s construction organizations and industrial zones in providing consultancy services and professional researches to enhance the quality of construction projects.

For AIT Faculty’s profile, please refer to www.set.ait.ac.th/ceim


Curriculum

No
Code
Course
Core course:
1
CE70.12
Organizational Management in Construction
2
CE70.21
Integrated Project Planning and Control
3
CE70.11
Project Cost and Financial Management
4
CE70.44
Communication and Negotiation skills for Project Managers
5
CE70.33
Safety and Health Management in Construction

6
CE70.22
Legal and Contractual Risk Management
7
CE70.43
Project Financing
8
CE70.13
Quality Management

Applied Project Management courses

9

Applied PM in Construction Business and Project  Simulation
10

Applied Project Management in Highway Projects
11

Applied PM in High-rise Building Projects
12

Applied Project Management in Housing and Real Estate Projects
13

Applied Project Management in Commercial Projects
14

Applied Project Management in Public Infrastructure Projects
15

Applied Project Management in Petrochemical Project



English Training Program
 AIT-VN  will conduct 8 weeks intensive English Training for those who need to improve their Academic English Skills before joining the program. The English Training Program also guides participants how to conduct AITEET.

Language
The program is conducted in English

Admission Schedule
For Hanoi & HCMC
Intake
August 2013
Deadline for application
31 July 2013
Deadline for Interview & Test AITEIT
Any time
Intensive English Training
19 March 2013
First class
September 2013

 Tuition and Fees

Tuition and fees can be paid as 3 installments and at the beginning of each semester. Total tuition and fees: VND 284,285,625 (VND7,824,375/credit). Break down of tuition and fees is:

1. Registration fee:                      VND 10,432,500

2. Tuition fee for 1st semester:   VND 93,892,500

3. Tuition fee for 2nd semester:  VND 86,068,125

4. 1st International fieldtrip fee:  VND 15,648,750
(8 days, 7 nights)

5. Tuition fee for 3rd semester:   VND 78,243,750

6. 2nd and 3rd Int. fieltrip fee:      VND 32,340,750 (*)

* Optional for 2nd and 3rd trip. Fee includes: air ticket, transportation, insurance and accommodation.
** R.O.E = 20,865 VND/1 USD. AIT reserves the right to apply the adjust tuition and fees without prior notice.


 Contact:
For morde detailed information please kindly drop at:
www.professionalprojectmanagement.blogspot.com



Asian Institute of Technology in Viet Nam
Ha Noi Office

Asian Institute of Technology in Viet Nam
HCM Office
Mr. Tran Anh Tuan

Ms. Nguyen Le Tuong
Tel: (84-4) 37669493 (131)

Tel: (84-8) 39107423 (117)
Cell: 01 285 687 168

Cell: 01 285 265 168
Email: anhtuan@aitcv.ac.vn