Monday 14 January 2008

Faculty Position at CEIM/AIT

FACULTY POSITIONS, SCHOOL OF ENGINEERING AND TECHNOLOGY, ASIAN INSTITUTE OF TECHNOLOGY (www.set.ait.ac.th). Applications are invited from suitably qualified persons for faculty positions at Assistant/Associate Professor level with the following specializations:

  1. Mechatronics and Microelectronics: Electronics, Robotics, Materials Engineering, Magnetic Recording Technology.
  2. Construction Engineering and Management: Property and Real Estate Investment and Market Analysis, Property and Land Valuation.
  3. Offshore Technology and Management: Offshore Structural Engineering, Offshore Project and Marine Operation Management.
  4. Structural Engineering: Concrete Structures, Construction Materials, Structural and Computational Mechanics, Earthquake Engineering.
  5. Water Engineering and Management: Water Resources Systems and Management, Urban Water Management, Hydraulic Engineering, Flood Management.

General Qualifications:

  • Must have a doctoral degree from a well-recognized university/institution with a strong research background and interest.
  • Competence in teaching and carrying out research at the post graduate level.
  • Excellent oral and written communication skills in English.
  • Exposure to the problems and prospects in the Asian Region will be an added advantage

Responsibilities:

  • Conducting all academic activities including teaching and research in the subject area of specialization.
  • Supervising master and doctoral student thesis work and publish outputs in recognized international journals.
  • Developing partnership with industries, government and international agencies.
  • Attracting sponsored research projects.
  • Participating in promotion activities to recruit student, short training courses, conferences/seminars, and other professional activities.

The successful candidates will be appointed at the earliest possible date, initially for a period of two years and is renewable, on two-year basis for Assistant Professor and four-year basis for Associate Professor, based on performance and productivity. Successful candidates will receive a salary competitive in the region, with generous benefits.

All personal particulars, details of qualification and experience, publications, and the names and addresses of four referees, should be submitted, not later than 29 February 2008, to:

The Dean
School of Engineering and Technology
Asian Institute of Technology
P.O. Box 4, Klong Luang 12120
Pathum Thani, Thailand
E-mail: deanset@ait.ac.th

The Asian Institute of Technology (AIT) is an international graduate institution of higher learning with a mission to develop highly qualified and committed professionals who will play a leading role in the sustainable development of the region and its integration into the global economy. Established in Bangkok in 1959, AIT has become a leading regional postgraduate institution and is actively working with public and private sector partners throughout the region and with some of the top universities in the world.

1 comment:

Unknown said...

Let’s not forget the many online college classes that need qualified Instructors.

Thanks!

Dapper Fellow