Master of Engineering
1. Mr. Hassan Ashraf
Thesis: Claims in Building Construction of Pakistan: A Statistical and Pathogenic Analysis
2. Mr. Thanapon Buaklom
Thesis: Development of Worker Safety Attitude Construct and Model in Oil & Gas Construction Project
3. Mr. Duong Quang Minh
Thesis: Factors Affecting Operation and Maintenance Costs of Ho Chi Minh City Condominium Projects
4. Mr. Nguyen Phung Hai
Thesis: Project Procurement Performance Models: A Case Study of Power Transmission Line Projects in EVN
5. Mr. Asmat Nabi Hotaki
Thesis: Sustainable Construction: A Study of Drivers, Barriers and Design Practices in Building Projects in Thailand
6. Mr. Mukesh Khadka
Thesis: Factors Affecting Constructability Practices in Hydropower Construction in Nepal
7. Mr. Pye Phyo Maung
Thesis: Resource Allocation Strategy for Construction Safety at Hydropower Project: A Study on Shwegyin Hydropower Project in Myanmar
8. Mr. Janeyut Naiyarat
Thesis: The On-Site Behavior of a Construction Project Team during the Implementation of The Planning and Quality System
9. Mr. Nguyen Tuan Tu
Thesis: Strategic Management Implementation of Vietnamese Construction Organizations
10. Ms. Kyawt Phyu Phyu
Thesis: Insurance and Surety Bonds: A Case Study of Petrochemical, Oil and Gas Projects in Myanmar and Thailand
11. Ms. Supatchana Pumpipat
Thesis: Effective Pricing Negotiation Strategy of Variation Claims in Commercial Building Construction
12. Mr. Puoy Puthitha
Thesis: Contractor Prequaification Criteria, Tendering Criteria, and Tendering Procedure in Cambodia Building and Housing Construction Projects
13. Mr. Kittawat Sukosi
Thesis: Quality Management System for Different Construction Project Strategies
14. Mr. Kyaw Min Thu
Thesis: Life Cycle Cost Analysis for Hydropower Projects
15. Mr. Nguyen Quoc Trung
Thesis: Influence of Financial Risk for Project Financing Throughout Real Estate Development Process: A Case Study of a High Rise Apartment Project in Vietnam
16. Mr. Hout Venghong
Thesis: Factors affecting the performance of the international construction contractors (ICCs) Doing Business in Cambodia
17. Ms. Vu Tuyet Mai
Thesis: Orientation Risk Management Model for Pre-Bidding Process in Low-Income Housing Projects with Public Private Partnership in Vietnam
Master of Science
1. Mr. Gentaku Goto
Thesis: Project Life cycle risk management plan in Urban Railway Development Project: A Case Study of Urban Railway Development Applied in Vietnam