Master of Engineering
1. Mr. Hassan Ashraf
Thesis: Claims in Building Construction of Pakistan: A Statistical and Pathogenic Analysis
2. Mr. Thanapon Buaklom
Thesis: Development of Worker Safety Attitude Construct and Model in Oil & Gas Construction Project
3. Mr. Duong Quang Minh
Thesis: Factors Affecting Operation and Maintenance Costs of Ho Chi Minh City Condominium Projects
4. Mr. Nguyen Phung Hai
Thesis: Project Procurement Performance Models: A Case Study of Power Transmission Line Projects in EVN
5. Mr. Asmat Nabi Hotaki
Thesis: Sustainable Construction: A Study of Drivers, Barriers and Design Practices in Building Projects in Thailand
6. Mr. Mukesh Khadka
Thesis: Factors Affecting Constructability Practices in Hydropower Construction in Nepal
7. Mr. Pye Phyo Maung
Thesis: Resource Allocation Strategy for Construction Safety at Hydropower Project: A Study on Shwegyin Hydropower Project in Myanmar
8. Mr. Janeyut Naiyarat
Thesis: The On-Site Behavior of a Construction Project Team during the Implementation of The Planning and Quality System
9. Mr. Nguyen Tuan Tu
Thesis: Strategic Management Implementation of Vietnamese Construction Organizations
10. Ms. Kyawt Phyu Phyu
Thesis: Insurance and Surety Bonds: A Case Study of Petrochemical, Oil and Gas Projects in Myanmar and Thailand
11. Ms. Supatchana Pumpipat
Thesis: Effective Pricing Negotiation Strategy of Variation Claims in Commercial Building Construction
12. Mr. Puoy Puthitha
Thesis: Contractor Prequaification Criteria, Tendering Criteria, and Tendering Procedure in Cambodia Building and Housing Construction Projects
13. Mr. Kittawat Sukosi
Thesis: Quality Management System for Different Construction Project Strategies
14. Mr. Kyaw Min Thu
Thesis: Life Cycle Cost Analysis for Hydropower Projects
15. Mr. Nguyen Quoc Trung
Thesis: Influence of Financial Risk for Project Financing Throughout Real Estate Development Process: A Case Study of a High Rise Apartment Project in Vietnam
16. Mr. Hout Venghong
Thesis: Factors affecting the performance of the international construction contractors (ICCs) Doing Business in Cambodia
17. Ms. Vu Tuyet Mai
Thesis: Orientation Risk Management Model for Pre-Bidding Process in Low-Income Housing Projects with Public Private Partnership in Vietnam
Master of Science
1. Mr. Gentaku Goto
Thesis: Project Life cycle risk management plan in Urban Railway Development Project: A Case Study of Urban Railway Development Applied in Vietnam
3 comments:
Nice Information, Thanks for sharing..
Machinery Manufacturers || Android mobile phones
Media Trellis is the largest network of Digital Marketing Consultants around the world and one of the Digital Marketing Companies in India. Get in touch with one of our experts for your Digital Business Analysis.
Advertising Agencies in Hyderabad
Outsource Website Development India
Hello Everybody,
My name is Mrs Sharon Sim. I live in Singapore and i am a happy woman today? and i told my self that any lender that rescue my family from our poor situation, i will refer any person that is looking for loan to him, he gave me happiness to me and my family, i was in need of a loan of $250,000.00 to start my life all over as i am a single mother with 3 kids I met this honest and GOD fearing man loan lender that help me with a loan of $250,000.00 SG. Dollar, he is a GOD fearing man, if you are in need of loan and you will pay back the loan please contact him tell him that is Mrs Sharon, that refer you to him. contact Dr Purva Pius,via email:(urgentloan22@gmail.com) Thank you.
Post a Comment