Innovation
Design Company (IDC) was founded in 2009. The main field of IDC is consultancy
in architecture and construction design especially in small and medium project
such as luxury low-rise building and villas. Customers that IDC have been
focused are high-income customers and foreign. IDC's initial goal is providing
high quality products with competitive prices compared to other consulting
firms in the country as well as foreign companies in Vietnam.
However,
after more than two years, IDC does not achieve the goals. In IDC, the design
process is mainly based on the experience of principal engineers and
architects, and almost has had no specific design process that is applied to
the entire system. In fact, there are many projects that spent cost, time and
manpower to redesign which affected IDC’s irrevocable capital and credibility
with clients.
Facing
the requirements to meet their own quality policy as well as pressure from
domestic competitors and foreign, IDC found that the establishment of a quality
management system process design is not lack. These projects have to propose
quality management system in design for IDC.
Mr. Dinh
Trung Thanh made a case study aimed to: (i) Design QMS for design firm; (ii) Establish
the design procedure and quality management system that meet the quality policy
of IDC and the standards of Vietnam as well as international; and (iii) Evaluate
the quality management system after applied in IDC.
Conclusion
The
proposed QMS basically meets the requirements to control the quality of design
in IDC. The QMS clearly identify the responsibilities of all members of the
system as well as individual responsibility in each period of design in
ensuring that the design meets the requirements of the customer and the current
standards of Vietnam.
Besides,
the proposed QMS also ensure that the information in the system is communicated
clearly and unalterable through input design system, manage and storage
documents, and document control. In Design Company, the communication is
consistent and clearly is a very important factor to ensure the correct design
with the requirements of the clients as well as the construction standards.
With
proposed QMS, the most important factors to ensure the success of the system
include:
1.
Accurate evaluation of customer requirements
2. Input
data application to project (specification)
3.
Internal audit.
4. The
process of check and review of the principal architects and engineers.
5.
Connectivity of the members and awareness of quality in design.
The QMS
system proposed is consistent with the scale and the current goals of the IDC.
With the successful application of QMS in the future, IDC may require the
organization to evaluate and receive ISO certification. With ISO certification
achieved, the quality of the design of the IDC is as good as international
quality; on the other hand the reputation in the market is better as well as
the credibility with customers.
Limitations
of the proposed QMS are not creating more value for consulting services as well
as product design. However, with current and potential target of the IDC, the
application of TQM is beyond. IDC can improve and develop on the basis elements
of ISO then apply the elements of TQM to develop the new stage.
His thesis abstract is
copied and pasted below.
Abstract
In construction industry,
a project is known to be successful when it meets three fundamental criteria
such as finishing on time within the budget, the prescribed quality
requirements such as satisfying customer’s demand and adapt safety in operation
stage. However, most of construction project in Vietnam have had problems with
the quality therefore, the time is often delay and the cost is out of control.
So, solving these problems has become more and more important in project
management in Vietnam.
In fact, there are many
reasons cause the quality problems in construction project. Follow the informal
investigations, there are:
- Goal and vision of
investor.
- Quality of consultant
and design.
- Check and review
design.
- Quality control in
Tender activity
- Quality control in
Construction phase.
- Quality of human
resource.
- Quality in consultant
and design is very important in a project from start to the end.
However in Vietnam, there
are a lot of consultant and design firm have no Quality management system (QMS),
or QMS is not effective, especially the medium and small firms.
This report will assess
and analyze quality factor in Consultant and design, and propose a quality
management system for medium and small architecture firm.
5 comments:
623Details about all business management, Portfolio management, Swaps, Risk element, Variance analysis, Professional management education, EMH, Pricing and all financial related details.
PROFESSIONAL MANAGEMENT
It’s good that IDC is now setting standards for design firms. This is really important, because the system will definitely improve the firm’s class standings in terms of quality design. Regardless of how good the design those firms will make, it won’t be graded as good quality if there’s no criteria that will assess their credibility.
Barton Wilson @ International Standards Authority, Inc.
ISO 9001-2008 is the most popular standard among all standards for large, small, medium and all other industries which have their own design, they do get ISO:9001-2008 certification for their Quality Management System with design, development scope additional to manufacturing, delivery, or other service provisions
iso 9001 certification
Nice post, I bookmark your blog because I found very good information on your blog, Thanks for sharing more information
ISO Certification
Post a Comment