Most construction projects begin
with recognition of a need for a new facility. Long before designers start
preparing drawings and certainly well before field construction can commence,
considerable thought must go into broad-scale planning. Elements of this phase
include conceptual analyses, technical and economic feasibility studies, and
environmental impact report.
-  Select location and content requirements of
the Project Owner
-  Market Research Project
-  Solutions of design
-  The related costs
His thesis deeply
analyzed how the plans of design influence to efficiency of the project and
make appropriate recommendations, and adjustments to ensure the economics of
the project. The purpose of the
research is to systematize the implement of setting up the investment projects
started from the selection of location, market research, solution design and
construction measures for the purpose of ensuring economic efficiency project.
Conclusion
Based on the market studies of
this project, requirements of investors as well as the solution design, the
difficulties and advantages of the project are evaluated as follows: 
Difficulties:
-  
The efficiency of hotel
investment project is low.
-  The
Scale of works is large and complex, so process requires well-organized of
security, sanitation, management. 
-  Features
links between building blocks reduce privacy and about the process for green to
win. 
-  The
costs of maintaining the fitness center, swimming pool and sauna will be very
high: Costs of swimming pool maintenance, costs of sanitary pipe,
personnel costs of continuous inspection and maintenance of sanitation in
areas. 
Advantages:
-  Characteristics
of the population: there is area of developed community, higher living
conditions. 
-  Large
scale projects will help to achieve a better deal and reduce maintenance costs
per unit area. 
-  The
ability to combine and save costs if we use and share the system control,
security, administration ... between the works together. 
-  To
ensure the economic efficiency of the project, we should focus on two main
issues as follows:
1.
        Development orientation of the project:
-  It is
necessary to have a scientific and long-term orientation for the entire project
in accordance with the assessment, analysis of market demand to avoid given the
subjective, impulsive orientation.
-  This
project only made the security design and costing investment but not to set up
the business plan and for the restore process. This is very important and must have been studied from the beginning to achieve synchronism for project.
2.         Research the safety design
  The
Underground:
-  Redistribute
the land boundary between the office block, apartment, hotel (from basement to
ground floor) and determine the use of each function areas. 
-  Review
technical planning area, M & E. 
-  Divide
the number of parking spaces to fit over the block. 
  The
Hotel: 
-  Change
of use from hotels to apartments to suit the needs of the market. 
  The
Office: 
-  Necessary
to determine a standard office class A or B in order to have adequate choice in
types of materials complete 
-  Adjust
the design to increase the use of performance floor – Office area with the aim
of achieving the efficiency 85%. 
  The
Apartment:
-  Adjust
the design to increase the use of performance floor - Apartments aiming to
achieve the efficiency 85%.
-  Adjust
the structure, proportion and number of apartments to suit the market demand.
Specifically reduce the number of large apartments, increase the number of
apartments under 120m2 to suit the large segment of the market. 
-  Decrease
the investment rate to reduce the price, which increase the liquidity to meet
the needs and generate greater attention for the product of apartment projects 
Abstract
The
major task in Hanoi’s plan is concentrated to the investment, construction and
development of the Capital to be a civilized urban, including basic completion
of ring roads No.3, three big bridges crossing Red river, construction of some
urban railways, continuous development of new and modern urban areas to the
South, investment of new urban areas on the West Lake and improvement of old
apartment buildings. Furthermore, the construction of new urban areas on the
North of Red river, development of water drainage plan, phase II shall also be
taken into account. Five concentrated urban sewage treatment plants shall also
be constructed and set into operation.
Beside
above-mentioned important projects, Hanoi shall also concentrate on developing
the service branches and fields as: tourism, trading, finance, banking, science
and technology, public health, education and training, public transport and
consulting services. 
Developing
solution: preparing to implement the service commitments within framework of
ASEAN - WTO; constructing the development project of 4 types of markets
including: capital market, stock market, real estate market, science and
technology market and labor market; constructing cooperation  mechanism between Hanoi and central,
provincial organs and cities in the whole countries; to provide favorable
conditions in terms of administrative procedures, investment policies for
enterprise to develop their services.
The
city is calling the foreign investment to high quality services, to meet more
than FDI-funded 30% capital; to utilize efficiently the investment, trading and
tourism promotion activities through great International events which are
organized in the capital and cooperation programs of Hanoi with big cities in
the world to extend the high quality service market and transfer of technology
and human resource training.
The
City is implementing the support policy, cost cutting, enhancement of
competitive capacity of businesses; to help the businesses to construct,
develop and broadcast the trademark; to encourage and honor the enterprises
with effect business. The periodical dialogue between City and enterprise
leaders shall be committed to annually organize to solve the difficulties in
investment, to meet the development requirement of the Capital.
Some
major development criteria to 2010:
+
Annual average GDP growth speeds from 2006-2010: reaching 11-12%.
+
The export turnover growth speed: from 15-17%/year.
+
Social investment growth: 17-20%/year.
+
Telephone density: 85-95 telephone/100 people.
+
Scale of population: from 3.6 million to 3.7 million people.
+
The rate of pour decrease to below 1%.
+
Averagely urban residence 9-10m2/person.
+
Urban fresh water supply 140-160 liter/person/day-night.
+
Public transport meeting 30-35% people’s demand.
Hanoi is proud to be a wealthy
economy, with young & active human resources having great aspiration of
their city and country, as well as an environment with more and more increasing
encouragement policy though it is still on development.
In the stable economics and
consumption development, the need on properties is more and more increasing
with remarkable speed. Due to the increasing income, the demands on better
accommodation, commodities and recreation goods also increase. The interest of
foreign foreign enterprises in making business in Vietnam also more and more
increases, especially when Vietnam has become a WTO member. As a result, it
leads to the urgent and great demand on high-quality Office, Residence and
Hotel.
Therefore, the development of
high-grade International-standard senior Hotel, Office and Apartment in Hanoi
is very essential and with economic efficiency. By this way, it contributes to
bring the comfort to foreign investors to Vietnam, meeting the necessary demand
to social life. Concurrently, project also contributes to develop the Vietnam
tourism, enhances the cultural exchange between Vietnam and Countries all over
the world, as Vietnamese Government’s opinion, to widen both domestic and
foreign exchanging and cooperation relationship. Moreover, the participation of
foreign enterprises in general and project in particular will contribute an income
to State budget and provide work opportunity for Vietnamese labors, and
indirect contribution to social stabilization.
This thesis will address the limited
factors affecting the economic efficiency in the work of the project
feasibility study and proposals, solutions to ensure effective project.
 