Most construction projects
begin with recognition of a need for a new facility. Long before designers
start preparing drawings and certainly well before field construction can
commence, considerable thought must go into broad-scale planning. Elements of
this phase include conceptual analyses, technical and economic feasibility
studies, and environmental impact report.
For example, location is
fundamental to planning for a new industrial plant. Where the plant can be
located to provide desirable, nearby employment for an adequate supply of
skilled and productivities workers? What are the present and projected costs
and customs associated with the labor force? Depending on the natural of its
raw materials input and its products, will the plant have access to the most
appropriate and economical forms of transportation, be they air, water,
highway, rail or pipeline? Does the local provide access to raw material and to
market? Are there adequate sources of energy, including gas, oil, and
electricity; and are there convenient communication facilities? What political
or institutional factors may ease or impede development and operation of
facility? What will be the sociological and economic impact of this plant on
the community? What will be environmental impact? What do all these factors
taken as a whole, mean for the technical and economic feasibility of the
project? Perform the feasibly study to ensure the effectively of the project.
The problem
involved in getting a project started probably:
- Design concerned by possibility that owners spend a lot
     of time and money
- Uncertain as to what the Scope of the project should be
- Worried about how much it is going to cost
Especially, refinery project have a lot
of items to study and design including marine facilities, which affect to cost.
Le
Tu Anh made a research to study how design and
selection of an optimal location for marine facility of refinery project
affects to project cost.
Conclusions
The Nghi
Son refinery and petrochemical complex project has been studied for long time. In this
research, the following were proposed:
Firstly, the research was
performed and then economic analysis was established. The data was used for
analysis based on the Primary design of marine facilities.
Second, the projects begin with
recognition of a need for a new facility. Long before designers start preparing
drawings and certainly well before field construction can commence,
considerable thought must go into broad-scale planning. Elements of this phase
include conceptual analyses, technical and economic feasibility studies. All
the factors taken as a whole, mean for the technical and economic feasibility
of the project. The costs of the marine facilities are estimated. The research
shown the optimal design and how impact to the project cost. The owner determines
time, money and scope of the items.
Finally, an analysis on the
result of the plan showed that the project was well planned, project bring high
advantage to owner.
Since the amount of investment
for Nghi Son Project has been the biggest in history, here in Vietnam, the
financing arrangement for the project is challenging. In order to deal with the
complexities of the project in reality, it is recommended that the research
conducted in this thesis should be extended to take into consideration the
following issue: It is necessary that the Government to grant special
incentives and support to improve the viability to enhance Equity IRR of the
Project. Based on this concept, the investors would like to propose following
incentives and Government supports, most of which have been accepted by the
Government. - Initial dredging for product jetty, crude oil jetty (SPM),
including harbor (water basin) and channels. 
The Dredging volume is big so the
Vietnamese contractor cannot be sufficient capacity during a short time. Then
Government should give special international contractor who have competence
implement the dredging item in the project.
Annual dredging cost of entrance
channel will be shared with the Government because the channel is used both
Export product jetties of NSP and berth No1 &2 of Local Authority.
Abstract 
The refining industry is one of the key industries
playing a very important role in the development of the national economy. In
addition to ensuring the national energy security, i.e. the supply of strategic
energies such as LPG, gasoline, kerosene, jet fuel, diesel, etc, the
establishment and development of this industry with the building of refineries
will pave the way for the other related industries such as petrochemical
industry, basic chemicals production, petroleum products transportation,
storage, trading and distribution.
Additionally, the existing of the refineries will
definitely bring about positive benefits in the socio-economic fields as well
as the national security and defense, making contributions to speeding up the
process of industrialization and modernization as proposed by the Government of
Vietnam.
Therefore, this thesis deals with how design and
selection of a optimal location for marine facility of refinery project to reduce
project cost.
 