Sustainable development is the new trend in the world due to the need of
human’s responsibilities to the environment, and green building in construction
industry is also a part of this. However, this area is still a new thing for
developing countries as Vietnam. There are many people talking about the green
or sustainability but it’s very difficult to understand it thoroughly, what is it
really and how to implement in each case.
At present, the demand and force
of developing a green building is high. 
Basically, the concept and guidelines
for green building are very good but there are some reasons and factors that
affect the projects which are the following:
1.      
The market 
2.     
Finance 
3.     
Politics
4.     
The resource
5.     
The techniques, technologies
and system
6.     
The real-life experience
The aim of the green building is to reduce the
negative impact to the environment. In other word, it’s also to conserve the
natural resource. In order to achieve this aims, the projects must be designed
as well as it can maximize the energy saving and minimize the cost for
construction by using less energy & water.
As the result, all stakeholders of the project need
to understand thoroughly what the green is and how to implement it during the
project life cycle – especially from the concept to design stages that will
affect strongly the next stages.
Furthermore, one building can only be called the
green once it is certificated by an independent third party with a rating
system.
Nguyen Huynh Trung Hai made a case study which objectives were to:
So in this report, the objectives of this study are:
1.       identify what
drives green projects 
2.      understand the
basis of popular green building rating systems – especially the BCA Green Mark
system (Singapore)
3.      study barriers
and benefits of green building project in Vietnam; and to suggest the solutions
for the barriers.
4.      propose a
framework to implement green building in Vietnam.
Conclusions 
1. The Green building in
Vietnam construction industry
Based on all issues and problems, it can
be said that green building will be the trend and good strategy for all
developers, consultants and others in Vietnam.  The benefits that can get with green buildings
are as follows:
1.
long-term economic
2.
productivity 
3.
the marketing
Moreover,
the biggest benefits are the good supporting for environment and health for
people’s working and living. 
For BCA Green Mark’s (Singapore) green
building assessment, it can be considered as a good and suitable system to
apply in Vietnam. In BCA, the main requirements and criteria for the building
are:
1.
Energy efficiency
2.
Water efficiency
3.
Environmental protection
4.
Indoor environment quality
5.
Other green feature
2. The challenges in
implementing the Green building
          Aside from the benefits mentioned
above, the implementation in every country might have different challenges. In
Vietnam, it will become more difficult due to lack of the knowledge in terms of
technique and technologies because of no previous green building like this. 
           Among the challenges, the key issue
is the higher cost for the green project. Moreover, at this time, the economy going down, so this issue
is really serious and it’s very difficult to attract the investors and others
who want to join in the green building. In general, some main barriers in green
building are:
1. Lack of technical and technology
2. Initial cost
3. Real life experience and non-educated green for
people     
           Therefore, project
management and the whole project team should have good project plans to lead
the project based on the owner and market needs.
3.
What drives green projects?
From the case study and literature review, there are
some main factors that will drive the Green building to success such as: the
owner’s project requirements and motivation, use the concept of commission and
integrated design process, effective execution. 
Recommendations 
1. For the green building
in this report
After studying the theories and the case study with
the problems, issues and how to implement the green building in Vietnam, the
recommendations for effective green building are as follows:
i) In the developing country as Vietnam, the green
building is the new knowledge for most of people. Moreover, within the economic
condition, the higher cost will be the serious barrier to attract the
developers and other. So the problem is what the way to solve this issue. The
most effective solution is the support from the government and community in
term of the money. They can be the good tax and special permit with short time
approval to encourage the developers and others.
ii) Vietnamese construction law should have the
basic requirements to catch up the environment issues as the global trend.
iii) The government and community have to find the
way to popularize the green concept for all residence understanding it
basically.
iv) With the tropical weather and environment,
Vietnam has a lot of natural material such as bamboo, refined brick… with very
cheap price, present everyplace and can be reused to avoid the impact to the
environment. So we have to consider this in spite of using the import material.
v) Combine the concept of eco-design – more concern
about the aspects of architectural design – and the technique, technologies –
concern about the mechanical aspect - 
will make the green building more effective.
vi) The developer should select the good project team
with the green experience and local condition that will affect the project to
avoid, reduce and eliminate the risk for the project.
vii) All participants who want to join in the green
building should start to think about the green with the long-term benefits.
Especially this will be the key for the developers who understand what they
want and invest their money directly into the projects. 
viii) All project team should study for their own
knowledge of the green building. 
Finally, the green building requires high quality.
Moreover, with very complicated parties involved, the project management and
project team should have a clear, concise organization, roles, duties and
responsibilities to avoid confusions and conflicts. Otherwise, the overrun of
time and cost will happen. 
Abstract
Nowadays, the sustainable development is the
necessary and urgent trend for the global environment. Acting as one of the
main parts of economic, construction industry also take part in responsibility
for protecting the environment through the building designed with low-impact to
environment. With the green building, there are many benefits to the
environment and as the result; it’s also good for human working and living in
life. Because of  the limitation of time
and scope, this report only try to explore the main issues in the
implementation of green building assessment system – especially the BCA Green
Mark – in construction environment in Vietnam. Maybe the BCA Green Mark
implemented for the case in this study is not popular in the world as other
such as LEED, BREEAM, CASBEE… but at least it can explore the typical issues in
the green building. From that case, we can learn some helpful lessons and use
them as the historical data and references for other green buildings. 
 
3 comments:
Hi
Nice post.it will be very interesting and informative to us.we have a news about real estate information.
Hi
this is really very helpful article. I go through this site really very nice information.thank for sharing such a nice information.
I agree with this as with the increase in the pollution in world it has become necessary to control the environment.
LEED Certified Building In Miami
Post a Comment