Invitation
to
Preparation English Training at AITVN
For AIT Postgraduate Programs
School of Engineering and Technology – AIT in Vietnam
Dear Applicants,
I have the pleasure in informing you that the School of Engineering and Technology (SET) – AIT will open 8 week English training for those applicants/candidates who are interested in the following Master programs in Project Management in Construction (MPM)
Training information:
Address: 45 Dinh Tien Hoang str., District 1, Ben Nghe Ward, HCMC (Opposite to HTV)
Duration: 26 March – 19 May 2012
Starting date: 27 March 2012
Tuition fee*: USD 400.00 USD
Tuition fee will be paid at the beginning of the training.
*: The tuition fee will be reimbursed for those candidates who are officially admitted to MPM program in September 2012 intake.
More details of the training objectives and training schedule can be found in the attachment.
Please complete and return the enclosed acceptance form to the AIT in Vietnam (AITVN), 6th floor, FCC building, 45 Dinh Tien Hoang, Ben Nghe Ward, Dist. 1, HCMC (Fax No. 08-39107422), attn: Ms. Nguyen Le Tuong (Tel: 08-39107423/ext.117) no later than 20 March 2012.
With best wishes,
This is a blog managed by Construction, Engineering and Infrastructure Management (CEIM) at Asian Institute of Technology, Thailand. In this blog, CEIM shares our activities in providing excellent professional project management education at Master and Doctoral levels in Thailand, Indonesia and Vietnam. http://www.set.ait.ac.th/ceim/
Sunday, 4 March 2012
COST
ESCALATION MANAGEMENT IN LOW-INCOME APARTMENT PROJECT
By
Ngo
Quoc Thai
Abstract
Vietnam
has become the official member of the World Trade Organization since 2007. This
dramatic event unfortunately occurred at the same time with the worldwide
financial crisis in 2008 and lasted to the present. Consequently, the real
estate and construction markets are affected strongly by the inflation, the
cost escalation and the tightly controlled credit strategy of the Government.
In
addition, project implementation naturally requires a long time to finish, with
a huge investment capital and various participating parties. Moreover, the
governmental policies in the real estate market and construction industry
usually change and overlap among authorities.
Generally
speaking, real estate developers are facing with complicated issues of
financial structure - the cost
escalation, the slump status of business
market; the worst status of
infrastructure and the incompetency
of management but above all it is the cost overrun in most
of the projects. As a result, costs of housing industry in Viet Nam
can be compared with the neighboring countries.
In order
to survive, real estate developers must devote themselves to researching about
potential cost escalation factors to find out the suitable strategies to reduce
and eliminate their impacts. Developers realized that the risks which must be
dealt with everyday require considerable foresight, attention to details and
tenacity if problems can add costs or cause ineffective overrun. Therefore,
most of the developers want to make the target cost plan is as much tightly
controlled as possible.
Executive summary
Rationale of research
This research has been conducted to identify the factors involving
cost escalation in Apartment projects.
Objectives of study
To study factors
affecting cost escalation and project management activities which can be used
to control cost escalation.
Methodology
The
exploratory research method is used to review the literature and study the cost management at
different stages of project.
Findings and conclusion
Project
value become uncertain by various reasons, and appears in each stage of project
processes. Risk of cost escalation cannot be eliminated, but can be minimized,
transferred or retained. There are some ways for risk arranging such as
transferring, avoiding, reducing the negative effect or absorbing them. Among
the risks, risk of cost escalation play the conclusive role and both parties
have to endure with many disputes if
that factor are not foreseen and discussed to solution before contract signed.
The
active and early identification, analysis and evaluation, with control measures
can reduce the impact of cost escalation factors and urgently needed to ensure
the feasibility and efficiency of the project. Cost escalation management should be valued and
implemented from the first steps of the project and continue to maintain in all
project implementation cycle.
The case in this
report describes a practical implementation in the underground construction
stage of an Apartment project. The project team obviously has revealed
high-risk factors can seriously affect the success of the project. All lessons
need to be conducted and learnt for experience.
The
report just briefly describes the various factors of cost escalation that are
normally influence to Vietnam construction industry. It is obvious that most popular
factors are widely known in construction participants and investors. A standard
mitigation plan of these kinds of risk should be prepared which cover all of potential sources of cost
escalation. This important issue should be discussed widely in project team
include Owner‘s staff, consultants, architects, engineers, contractors.
In the
process of integrating with the world’s economy, Vietnam has been influenced
strongly by positive factors on the cost management, contract administration.
There are many researches to control the cost escalation in construction
projects. However, the following issues are still present and harmful for the
success of a project:
·
Inflation: This issue almost breaking all attempts
to cost controlling.
·
Government: Bureaucracy, Fluctuation; Late in corruption
defense.
·
Contractual Risks : Understanding , obedience ,
respecting the Law
·
Lacking of
transparency:
An unclear environment is the major factor contributing towards cost escalation.
We do believe that engineers who address these
escalation factors when assessing future project cost and who seek to mitigate
the influence of these factors can improve the accuracy of their plan, their
cost estimates and program budget. Author of this study do hope that the future
of project management in Vietnam will be better, the cost escalation will be
well management; these are also the purpose of our work.
Recommendation
For Project Owner
·
Foreseeing
and prepare a contingency plan and preserve a maximum risk premium within
budget.
·
Transferring
partly through a complete strategy in contract
·
Applying
policy of advance payment specified for price escalation to fix the price
during construction time.
·
Maximizing
profit margin to ensure the risk premium can cover the loss from inflation.
·
Postpone
the large project until the financial crisis is over.
·
Put
priority in recruitment the competent team. Periodic training to the staff.
·
Review
the planning and executing work including selection of project delivery method,
development of project documentation and selection of contractors.
·
Transparency
must become core value in overall process.
Auditing and checking project management activities
RISK FACTORS IN WATER ENVIRONMENT
IMPROVEMENT PROJECT: A CASE STUDY OF BIEN
HOA CITY
IN DONG NAI PROVINCE
By
Le Van
Tuan
Abstract
The
developments in field water environment improvement are still slow and delay
because there a lot of problems happened in development the project. therefore
make project stage cannot be completed as expected, by analyzing to find out
the root causes of these problems from the data, which are investigated from a
real project, base on key relevant theories, the Author would like to develop
the solutions for future improvements.
Executive summary
Rationale of research
This research has been conducted to identify risk factors in water
environment improvement projects.
Objectives of study
To study and analyze
activities in water projects to find the risk factors and propose solution.
Methodology
The
exploratory research method is used to review literature and study the “Dong Nai water
environment improvement project (sewerage and drainage sector)”.
Findings and conclusion
This
report describes risk factors in each phase development of Dong Nai water
environment improvement project, and has revealed high-risk factors
can seriously affect the success of the project. Actually, Rationale of research
Vietnam
present has enormous efforts to overcome policy and reduce risk in development
project. However, investors still face a lot of problems (risks) when development project.
This research has been conducted to identify risk factors in water
environment improvement projects.
Objectives of study
To study and analyze
activities in water projects to find the risk factors and propose solution.
Methodology
The
exploratory research method is used to review literature and study the “Dong Nai water
environment improvement project (sewerage and drainage sector)”.
Findings and conclusion
This report describes risk factors
on each phase development of Dong Nai water environment improvement project,
and obviously has revealed high-risk factors can seriously affect the success
of the project. Actually, Vietnam present has enormous efforts to overcome
policy and reduce risk in development project. However, investors still face a lot of
problems (risks) when development project.
The report may not offer the
complete of risk factors in various stages of project implementation, but also
clear description of the risk factors may affect the efficiency projects that
most water environment improvement projects in Vietnam are all experiencing the
problem of land acquisition and resettlement, legal, project costs incurred up
compared to initial estimates of financial, construction progress and fund for
operation and maintenance.
Recommendation
Study
suggests measures to improve the management process of the development stages’
project. Note that the proposal cannot be applied to other project which not
use ODA loan and in field wastewater treatment.
1.
Land
acquisition and resettlement:
·
Acquisition of land and other assets, and
resettlement of people will be minimized as much as possible.
·
All Project Affected Persons (PAP) residing,
working, doing business or cultivating land within the recovered area for the
Project as of the cut-off-date, are entitled to be provided with rehabilitation
measures sufficient to assist them to at least maintain or improve their
pre-Project living standards.
-
compensation at replacement cost, without
deduction for depreciation or salvaged materials from houses and other
structures;
-
priority given for agricultural land-for-land of
equal productive capacity acceptable to the PAPs;
-
replacement of residential land of equal size
and acceptable to the PAPs;
-
transportation and subsistence allowances; and
-
Business/income rehabilitation allowances (even
for non registered businesses).
-
Replacement of residential and agricultural land
should be as near as possible to the land/compensation that is lost.
-
Particular attention should be paid to the needs
of vulnerable groups among those displaced, especially those below the poverty
line.
-
Appropriate reporting, monitoring and evaluation
mechanisms should be identified and set in place as part of the resettlement
management system.
2.
Legal: The government
should be modified, reduced many regulations in Laws to
do the project more
quickly, so investors have more responsibility and
can actively to make decision in the implementation of the project.
3.
Financing:
·
Structure of project financing: The government
in Vietnam should require to Plan and use ODA to specify findings of an
analysis of the institutional framework covering:
- the identification of agencies
responsible for use ODA loan activities and authorities of all levels that have
a role in project implementation;
- an assessment of the
institutional capacity of such agencies;
- Do implementation
of transparency in the use
of loans.
·
Project cost estimate:
- Cost estimation should carefully be
conducted in terms of recent Vietnam economic condition basic cost of is
increased in Vietnam.
- To assure the quality in the cost
estimate phase of projects, the investor should have a good training program
for their engineering staff, which develop cost estimate. Training on the job
is a good method to help employees to be more professional.
4.
Construction: using WBS to divide
and control schedule. The contractor should focus to difficulty objectives to
reduce risk or delay on project.
5.
Operation
and Maintenance: Dong
Nai province People's Committee and centre Government should build a legal framework. It will create the financial
foundation for wastewater treatment company like:
- Development of
sewage tariff schedule, raising program and method for applied gradually offset
the cost price are also necessary to operate system with sustainability from
the point of view of finance.
-
Create navigation tools
to help investment.
The
report may not offer the complete of risk factors in various stages of project
implementation, but also clear description of the risk factors may affect the
efficiency projects that most water environment improvement projects in Vietnam
are all experiencing the problem of land acquisition and resettlement, legal,
project costs incurred up compared to initial estimates of financial,
construction progress and fund for operation and maintenance.
Recommendation
Study
suggests measures to improve the management process of the development stages’
project. Note that the proposal cannot be applied to other project which not
use ODA loan and in field wastewater treatment.
1.
Land
acquisition and resettlement:
·
Acquisition of
land and other assets, and resettlement of people will be minimized as much as
possible.
·
All Project
Affected Persons (PAP) residing, working, doing business or cultivating land
within the recovered area for the Project as of the cut-off-date, are entitled
to be provided with rehabilitation measures sufficient to assist them to at
least maintain or improve their pre-Project living standards.
-
compensation at
replacement cost, without deduction for depreciation or salvaged materials from
houses and other structures;
-
priority given
for agricultural land-for-land of equal productive capacity acceptable to the
PAPs;
-
replacement of
residential land of equal size and acceptable to the PAPs;
-
transportation
and subsistence allowances; and
-
Business/income
rehabilitation allowances (even for non registered businesses).
-
Replacement of
residential and agricultural land should be as near as possible to the land/compensation
that is lost.
-
Particular
attention should be paid to the needs of vulnerable groups among those
displaced, especially those below the poverty line.
-
Appropriate
reporting, monitoring and evaluation mechanisms should be identified and set in
place as part of the resettlement management system.
2.
Legal: The government
should be modified, reduced many regulations in Laws to
do the project more
quickly, so investors have more responsibility and
can actively to make decision in the implementation of the project.
3.
Financing:
·
Structure of
project financing: The government in Vietnam should require to Plan and use ODA
to specify findings of an analysis of the institutional framework covering:
- the identification of agencies
responsible for use ODA loan activities and authorities of all levels that have
a role in project implementation;
- an assessment of the
institutional capacity of such agencies;
- Do implementation
of transparency in the use
of loans.
·
Project cost
estimate:
- Cost estimation should carefully be
conducted in terms of recent Vietnam economic condition basic cost of is
increased in Vietnam.
- To assure the quality in the cost
estimate phase of projects, the investor should have a good training program
for their engineering staff, which develop cost estimate. Training on the job
is a good method to help employees to be more professional.
4.
Construction: using WBS to divide
and control schedule. The contractor should focus to difficulty objectives to
reduce risk or delay on project.
5.
Operation
and Maintenance: Dong
Nai province People's Committee and centre Government should build a legal framework. It will create the financial
foundation for wastewater treatment company like:
- Development of
sewage tariff schedule, raising program and method for applied gradually offset
the cost price are also necessary to operate system with sustainability from
the point of view of finance.
-
Create navigation tools
to help investment.
DELAYS IN FLOOD PREVENTION PROJECTS
A
CASE STUDY OF URBAN DRAINAGE PROJECT MANAGEMENT UNIT
By
Le Do
Abstract
Currently,
the overload on drainage of the existing systems along with the development of
the increasing urbanization of the big cities like Ho Chi Minh City has led to
flooding on many streets, with the level of flood is wider and heavier day by
day. One of the issues affected by flood that is the congestion and traffic
jams on the roads of Ho Chi Minh City’s areas, which has caused pressing and
affect the economic and social activities, life environment and the daily
activities of people traveling in the region.
In the
recent period, the city government also is trying to invest in renovating and
upgrading of infrastructure for roads and drainage in the areas of Ho Chi Minh.
Typically, a water infrastructure projects have been implemented on a large
scale, specifically: Ho Chi Minh City Environmental Sanitation Project Basin
Nhieu Loc - Thi Nghe; Ho Chi Minh City Water Environmental Sanitation Project
Basin Tau Hu - Ben Nghe - Kenh Te - Kenh Doi; Canal Tan Hoa – Lo Gom Sanitation
and Urban Upgrading Project, etc.
However, in
the process of implementation has encountered many difficulties such as the
construction schedule are affected because the infrastructure systems are not
controlled, the weak contractor capacity, capital limited investment. Besides,
the function of our State Management is loose, many duplicate projects which we
call "walked together" projects, plus with the investment does not
spread as a strategy or a specific plan has made to a waste of investment. All
of these are leaving a result, an issue that needs attention and consideration,
which is effective in the management of construction and drainage in the areas
of Ho Chi Minh City.
Facing this
reality, those problems require the city authorities need to organize and
research actively, inspection and review the city’s management and construction
drainage system now. That work to ensure if they has consistent and effective
in the current development phase to propose remedies and the develop
orientation in the management of construction and drainage system in the
future. Besides improving project schedules is the most important in order to
solve aspiration of urban residents. That is why I chose this topic for my last
case study.
Executive summary
Rationale of research
This research has been conducted to identify delay factors in
flood prevention projects.
Objectives of study
To study and analyze
delay situation in past flood prevention projects at construction sage and
analyzing activities causing delay in projects in government funded projects
Methodology
The
exploratory research method is used to review theory of flood prevention
projects in Ho Chi Minh City from 2008-2011.
Findings and conclusion
In Flood
Prevention Projects, contractors seldom cause critical delays. It is easy to
understand this problem. Work characteristics are not complicated and
contractors set too much task durations. Therefore, they always have extra time
to finish tasks. However, they never try their bests to reduce project
durations. This is a problem that schedulers must pay attention.
In the other
hand, critical delays are caused by lacking corporation between government
operators. This problem is a general disadvantage that government authority
always tries to improve. In my opinion, it is proceed from organization
culture.
Recommendation
For heavy rain
·
Need to plan master schedule in accordance with rainy
season (May-October) to avoid delay.
·
Contractor must prepare pumping to solve storm water in
excavation. Besides SCFC force contractors equip pumping to help owner solve
emergency situations at flooded streets.
·
To avoid bad weather conditions, using new technology
construction such as: Cured-In-Place Pipe, (CIPP) technology and Pipe – Jacking
technology. However, It is not used for small projects because of its
expensiveness.
For catching infrastructure systems
·
For
long term: building digital infrastructure map to be prepared and use of new
technologies.
·
For
short term: Strict co-ordination with the parties associated is required.
For waiting sewage connection
·
Setting contingency duration in schedule.
·
Setting project end date for project.
For lack of contractor capability
·
Apply modern project management skills
·
Change of direct contracting methods
·
Strict supervision.
Future research
In this case study, we only discuss about delays in construction stages. However, because of lacking databases and time, case study still has some defections. Actually, in conceptual and design stages, owners and approval organization always cause critical delays. The main reasons are unsuitable organizations, extra-complicated approval process and bad master planning.
In the order hand, databases that we collected are not much. Therefore, the statistic is not quite exact. In future, SCFC will run more and more projects to prevent with climate change. Certainly,
Thursday, 1 March 2012
Sunday, 26 February 2012
BUSINESS PROCESS MANAGEMENT AND KEY PERFORMANCE INDICATORS IN
REAL ESTATE CONSTRUCTION
By
Le Anh
Thai
Abstract
The
controlling of construction processes is important to achieve project’s goals.
Many companies now start look for solutions to optimize their own business
process. In order to develop in business area, every organization has to
continually finding solution for business to act in term of effectiveness and
efficiency. The question to save cost and business improvement is the effort so
that organizations must consider if they want to maintain sustainable
development. How to ensure that the organization is operated effectively and
whether the organization is taking competitive advantage? These problems only
answer if the organization know their own business processes and have clearly
measure, monitor and analyzes its performance.
This
report is going to make effort to understand the applied of Business Process
Management (BPM) and Key Performance Indicators (KPIs) which should be
implement in construction stage to measure the effectiveness and efficiency of
the construction process.
Executive
summary
Rationale of research
This research has been conducted to identify key performance
indicators to improve construction process in real estate project.
Objectives of study
To study business
process management (BPM) in real estate construction projects, to identify the
indicators for improving construction process.
Methodology
The
exploratory research method is used to review theory of business process
management and performance management of construction processes.
Findings and conclusion
In
applying BPM in the construction stage, the most important is to identify main
phase, sub-process to be delivered. The main process need to focus control the
output, and also control issues in sub-processes. After the main or critical
processes were identified, it is necessary to assess the process performance.
The key performance indicators is defined to evaluate whether the process
performance comply with organization’s goals and objectives.
For effective implement BPM in construction
stage, we should understand all the process of construction stage. And identify
critical process to focus controlling. No need to control all the process in
order to reduce expense for measurement activity, but the result still
acceptable. There is very little guideline in selecting which indicators is
appropriate lead to achieve project objective and organization‘s goal. The
measurement process should regularly audit to guarantee the transparency. The
follow indicators is the most applied in measuring the construction process.
Performance measurement allows an
organization to determine what is working and what is not. In order to make
effective performance measurement and to improve construction process, one must
identify appropriate Key Performance indicator to focus on. In construction
process generally, and real estate construction process, it is difficult to
develop an agreed set of KPIs, because of the nature of construction
industry.
Recommendations |
- Cost
performance: It shows how the process consume budget. This performance
indicator also tells about how effective the budget control.
- Time
performance: this KPI tell whether the process has completed on planned schedule.
- Quality
performance: this measurement shows the degree of satisfaction of the
process to the requirement.
RISK
MANAGEMENT OF DIAPHRAGM WALL CONSTRUCTION
AFFECTING
ADJACENT BUILDINGS
A
CASE STUDY OF CONSTRUCTION PROJECT
IN
HO CHI MINH CITY, VIETNAM
By
Huynh
Thanh Quang
Abstract
In Vietnam was, is and will
construct several buildings with basements. The construction of the
basement in the soft ground in urban areas is more difficult and risky. There
have been many successes but also happened to shame. There are many causes affecting
the displacement of the structure and the land around the pit with and without
adjacent works. Due to the urgent problem is mentioned so many studies
summarizing the experience in the design and construction of over. This project report studied about
risk management of basement construction affecting adjacent buildings.
We can
only avoid the risks have clearly defined the cause risks to be proactive
prevention measures in quality control work is to manage every stage of
investment preparation, performance investment and exploitation. To limit risks in this
problem, we must to risk identification and solving methods of risk
in preparing and constructing stage of diaphragm wall and basements. Although
many projects have quality management system, but risk still occurs, and even
causing very severe damages for surrounding building.
Therefore,
risk identification is the problem very important in quality management system
of the project.
Executive
summary
Rationale of research
This research has been conducted to identify risk in construction of Diaphragm
wall.
Objectives of study
To identify the risk factors
involving construction of Diaphragm wall and its effects on surrounding
buildings and to propose recommendations to
reduce its effect on surrounding buildings.
Methodology
The
exploratory research method is used to study Diaphragm wall construction process by
analyzing case of a building construction project Ho Chi Min City Vietnam.
Findings and conclusion
We can only avoid risks when we identified the cause
of risk clearly and made a proactive and preventive measure in project quality
management. So, the cause analysis of incident, technical error should be
considered large study range in the development strategy of science and
technology. Practice shows that many building was caused incidents in execution
process of basement, it create severe impact such as structure damages,
non-uniform settlement, collapse, casualties etc, some of the problems happened
at site are as flows.
·
Damages
to the adjacent buildings due to movement of machines and vibration caused by
execution of diaphragm wall and bored piles, it will bad impact on the adjacent
buildings.
·
Increasingly
local deformation of the diaphragm walls made surrounding soil deformed.
·
Defect
on the diaphragm wall have occurred pierced holes at basement.
We can
see the above reasons are due to less experience of managers. Besides, the
investor and relevant parties does not expected budget for risks. If the
funding to solving of risks have not or not enough, plans for risk management
will be limited and not efficient.
Recommendations |
Limit
and control of incident are a very complicated task; it requires high level
experienced experts and responsibility before the work. Before design and
building construction, the consultant must be to investigate the surrounding
building thorough, to clarify the position, the status of the building,
underground structure, roads, underground pipes, etc, currently in incidence,
and estimated affect about adjacent building due to pumping lower ground water
level and basement excavation. The contractor must be proposed method to
prevent, control, observation and deal with urgent incidents when they happen.
The
risks might cause severe incidents (Defect on diaphragm wall (pierced holes),
deformation of shoring and king-post system, settlement of adjacent building,
displacement of diaphragm wall, etc), there solving problem when it happened is
quick enough and thoroughly. They must have plans to deal with urgent incidents
and to focus on manpower, equipment and finance to solving risks. Besides, when
incident happen they must to displacement and settlement observation for the
building and adjacent building. Moreover, they should be study geologic
conditions inside and outside the building, this problem is also very important
in during process of observing and solving incidents, even solution to move
people exit dangerous area when incidents happen.
Subscribe to:
Posts (Atom)