Construction industry is considered as one of the most complicated industries because of its uniqueness, rapid growth, and dynamic nature. All the three main resources of this industry, i.e. labor, material and equipment have their own complexity and moreover their complexity vary with environment or workplace. Complexity and dynamic nature of construction industry makes it very difficult for the department of management of the company to take care of the occupational health and safety of their employee in construction site.
Every day construction site deals with lots of activities which surround with different hazards. Most of the company has many manuals, rules, regulations, and checklists. So it is very difficult for a safety officer to remember all the things to do. So it becomes essential for a development of a tool which can remind safety officer that the activities that should be done daily, weekly and monthly. This also helps new safety officer as his tool of assistance which can remind him important jobs to be done priority wise.
According to Cheung et al. (2003) safety and health issues are of very dynamic nature in construction industry. Anytime and anywhere new hazard can be identified and accident may occur. For that purpose sometimes safety officers require expert advice and instruction. It will be advantageous for a safety officer if a tool is designed to enable online expert advice and instruction.
More over Cheung et al. (2003) emphasized on the requirement of a detector of potential risks and hazards which can able to highlight with a warning sign to the activities that required immediate corrective action.
Kartam (1997) has identified three main elements who are obligated to provide safe work environment. They are owner, contractors and regulatory agencies. All this three elements has different needs towards safety. Owner needs a tool to monitor and control safety during construction and to assess safety plans as criteria for selecting a contractor. According to Kartam (1997) contractors need a tool by which to actively integrate safety and health measures into project planning.
Mr. Bhaskar Jyoti Das conducted a study which main objective was to develop an information technology application, which can facilitate construction safety officials to manage health and safety. In order to obtain the main objective, the following sub-objectives must be fulfilled: (1) to identify and understand the safety practices; (2) determination of the system requirement; (3) design and development of the databases system to store safety information; and (4) to design and development of Information Technology (IT) application.
Conclusions
Identification of Safety Practices
After reviewing the literature in construction safety and by interviewing different safety officers, the various safety practices in construction industries are identified. Those are listed below.
- Management roles & responsibilities
- Work method statements
- Safety Planning
- Orientation
- Training
- Safety Meeting
- Toolbox Talk
- Audit of Safety Performance
- Records and Reporting
- Accident Investigation
- Health and Safety Promotion
- Development of Emergency Response Plan
- Risk identification, assessment & control
- Global minimum requirements
- Software use
These practices are used in determining the requirement of the IT application.
Determination of System Requirements
To solve all the problems mentioned above, the construction industry demands a computer application which can be used for planning, monitoring and trending.
· Linking of safety information with project scheduling software like Primavera Project Planner and Microsoft Project.
· Planning of occupational health and safety issues accordance with the project schedule.
· Activity wise citation of occupational health and safety issues for the purpose of review and discussion in safety meetings.
· Addition or modification of safety library anytime
· Safety assessments which address the specific hazards of the site
· To monitor the performance using the data gathered from safety audit.
· Using historical data, to find out the trend of safety performance.
· Remind the user for required safety practices need to perform
· User friendly and compatible with Windows operating system
Considering the above mentioned requirements as baseline, the computer application ACSM-PMT is designed and developed.
Development of the Database System
For planning, monitoring and trending, the system needs to store all the information in a safe and secure location for easy access. A database would be ideal to store all the information. Four different databases have been developed:
Project Schedule: To store the project schedule imported from Primavera Project Planner or Microsoft Project.
Safety Library: To store Hazards and their related information
Safety Records: To store the data from safety audit and accident investigation report
Utility: To store user information, administrator information, and project information.
Development of IT Application
The IT application ACSM-PMT is basically a database management application. This IT application retrieves relevant information from the Database System to present them in a familiar format based on user specifications. The application can use for planning occupational health and safety aspect accordance with the project schedule. Along with the planning, ACSM-PMT can generate work method statement for the activities. The safety audit checklist specifically directing the onsite hazards and accident investigation reports can also be generated. It gathers data from the safety audit and recalculates it in order to be displayed in safety meter graphs. Based on the data accumulated from the safety audit, the user can additionally use the application to compare the performance between various projects. In addition the system can also use for risk analysis based on the collected data from the safety audit and accident investigation report. A reminder function is developed to remind the safety officer about the onsite hazards which are also linked with the corresponding general guidelines files of the hazards for their reference.
The IT Application has been developed using Visual Basic (VB). VB 6.0 was used since it is easy to deploy the project in Microsoft Windows. VB additionally provides a very user-friendly environment. For displaying the results Microsoft Excel and Microsoft Word has been used.
Evaluation
The evaluation was done in two stages i.e. system verification and system validation. For system verification, initially a case study was developed to test the system. Implementing the case study, all the functions were tested and the system was running as per expectations. All the functions gave error free results both in terms of required information and visualization. Connections and query between the databases were found to be established successfully.
Validation was carried out to determine its utility in he construction field by demonstrating the application ACSM-PMT in front of experts in the field of construction. The experts rated the applicability of the system as useful for the construction industry. On the average the system is also rated as easy to use.
His thesis abstract is copied and posted.
Abstract
Saving lives and reducing injuries is crucial for every construction business. Construction companies can save money and improve productivity by using an effective health and safety program. This thesis aims to develop IT software capable of managing health and safety issues by Planning, Monitoring and Trending/Analyzing. It is planned to be used as a supporting tool for the safety officers.
The system requirements are gathered from literature review and interviewing safety officers. Based on the requirements, the databases and the IT application are designed and developed.
This software imports project schedules from Primavera Project Planner and Microsoft Project, and links with the safety library. The user can view information regarding the risk level of on-going activities, their work method statement, and other information. The safety audit checklist and accident investigation reports can also be generated. The system additionally supports safety meter graph, and can be used to compare the safety performance of different projects.
As a final step of this work, the software has been tested for its accuracy and reliability by taking some case studies under consideration. On the brighter side, the outputs obtained for the case studies have been quite satisfactory. This implementation of the software on case studies and the outputs thus obtained have been demonstrated in front of experts in the field of construction for their much sought after comments and suggestions. Based on feedback from the experts, it can be concluded that the system can be successfully used in real-time for planning, monitoring and trending/analyzing safety performance in construction industry.
21 comments:
Project management includes various tasks that you and your team need to employ to achieve a goal. Proper project management systems are vital for any project. It is very difficult to manage the whole team without any commanding tools. To resolve this problem web based project management software has been introduced by many companies, as the goal is to increase the efficiency and cost-effectiveness.
The fastest and most powerful laptop won't do much for a user on the road if it weighs 10 pounds and gets barely an hour of battery life -- or can't open in a coach seat on a plane. By contrast, the ability to check email, browse the web or listen to music doesn't matter if your phone won't make a call when you need it to.
Nice post to know the information. Safety is very much necessary at the time of construction. One of the most significant things when it comes to construction safety is the usage of the right tools and clothing. Safety helmets, boots and gloves should be worn at all times.
Time management is important for the successful running of any company, no matter what the size. With so many software tools on the market today there is no reason why any company shouldn’t be taking advantage of these types of functional methods of tracking time and employees.
On the new edge of business, every company’s HR policies ensure the right employees are hired. Meanwhile, HR takes care of the ins and outs of time utilization for employees. With the traditional approach this becomes a complex duty for HR. Many companies are adopting the latest technology to help HR make the right decisions for each employee’s growth.
It is very important that any company keep track of employee’s data and their time utilized in the office. With the traditional collection system it is quite difficult to tell the difference, so most companies have started to use employee time tracking software. This software is very effective and accurate at tracking employee’s comings and goings. Lots of companies have started to use it and it has made the difference in their HR and increment systems.
Geographical information systems (GIS): Tools for cartographic data entry, mapping/spatial query, and visualization of maps
There is nothing is as important as safety in the construction site. Many workers will be busy applying tactics to complete the work with quality so they need assurance of the security to them and their jobs. For this the manager is supposed to have a safety management plan.
Wow, we really need to make a difference!
Hi,
your blog is awesome..my friend suggest me your blog and I really like.Its good to read say your efforts we can see on your blog.
Nice post. It's great that you are sharing your insights about construction safety management.
This information will be very useful and keeps our projects safe. Thanks for the post!
Thank you for the post. I recently bought a Employee time tracking software for my new company. I could not be happier with my choice.
www.Itcourses-distancelearning.com
click here
National institute is the largest leading chain of skill based hands-on line -training providers for Vast Rang of
v Safety Officer/safety Engineer course
v Hotel management course
v Air Line Ticketing course
v Cabin Crew Air Hostess course
v Seo Search Engine Optimization course
v spoken English course
v Call center training course
v Web Development course
Technical Vocational
Training Courses Pakistan and All over the World. Its Educational Heritage Can Be Traced Since 2007. National Institute has always led the market by introducing latest market driven IT, linguistics and online Courses. National institute is a trusted name in the field of on line education and training having the largest chain of institutions in the on line worldwide. National institute has a large group of happy &satisfied students attaining successes in their future lives & prospects.
click here
Many workers will be busy applying tactics to complete the work with quality!
Construction Companies
Safety is a serious thing on all construction projects for numerous reasons and saving workers lives and plummeting injuries is very decisive for every construction business nowadays.
Using particular Project management software that are most suitable for one business, this project management task become very easy and less time consuming. Thanks for sharing your ideas. I hope you write again soon! Just love to read your post.
Project management is very important in every aspect as it plays an important role in growth of any organization.
Web Based Timesheets
I've read several excellent stuff here. Definitely worth bookmarking for revisiting. I wonder how much attempt you put to create any such magnificent informative web site.
Construction management software
Sure are a lot of things to cover when it comes to construction site safety! Thanks for sharing this.
-Jackie
Projects Management is done for different fields in different organizations, that's why it is not limited to any single domain. Getting complete PMP certification benefits a lot to a candidate.
Your blog is awesome..my friend suggest me your blog and I really like.Its good to read say your efforts we can see on your blog. Now its time to avail party bus dc for more information.
Post a Comment