Prof. Griggs is also a Consulting Professor in the Civil and Environmental Department, at Stanford University. Some of his selected projects are:
1. Bay Area Rapid Transit (BART) System, Bay Area, California
2. Doyle Drive Replacement Project, San Francisco, CA
3. San Francisco Municipal Transportation Agency, Central Subway Project, San
Francisco, California
4. Cooper River Bridges Replacement Project, Charleston, South Carolina
5. East Side Access Project, New York City
6. San Francisco International Airport AirTrain, California
7. Central Puget Sound Region Link Light Rail Facilities Design, Seattle, SeaTac, Tukwila,
and Tacoma, Washington
8. State Route 520 Corridor Improvement Project, Seattle, Washington
9. Federal Emergency Management Agency (FEMA) Disaster Response Services
Technical Assistance, Western U.S. and Pacific Territories
10. Mexico City Water Project, Mexico
11. Kaohsiung Mass Rapid Transit, Taiwan
12. Seoul Metropolitan Subway, South Korea
13. Busan Metropolitan Subway, South Korea
14. Florida High Speed Rail
15. Northeast Corridor Improvement Project, Washington, DC to New Haven, Connecticut
16. Iscor Railroad Electrification, South Africa
17. EFVM Railroad Electrification Study, Brazil


2 comments:
This is definitely a nice post. Great works. Thanks for sharing with all of us.Keep posting more.
It really helps me. I'll follow you regularly. Thanks
Job oppurnity for nigerian peopole as well as international people, submit Engineering CVs
Hello Everybody,
My name is Mrs Sharon Sim. I live in Singapore and i am a happy woman today? and i told my self that any lender that rescue my family from our poor situation, i will refer any person that is looking for loan to him, he gave me happiness to me and my family, i was in need of a loan of $250,000.00 to start my life all over as i am a single mother with 3 kids I met this honest and GOD fearing man loan lender that help me with a loan of $250,000.00 SG. Dollar, he is a GOD fearing man, if you are in need of loan and you will pay back the loan please contact him tell him that is Mrs Sharon, that refer you to him. contact Dr Purva Pius,via email:(urgentloan22@gmail.com) Thank you.
Post a Comment