Safety Management in High-Rise Construction

High-rise buildings are the current trend in construction nowadays because of its convenience, advantages, architectural design, grade and luxury. Not known to many, it has many safety risks for occupancy. Mr. Nguyen Phu Hoi made a case study which mainly focused in safety aspects to come up with the solutions on how to control risk and to prevent accidents as much as possible as well as to foresee/handle emergencies/contingencies during the construction duration.

The most frequent problems/accidents related to safety in high-rise construction often include:
1. Ladders
2. Falling Debris
3. Falling From Heights
4. Electrical shock & Machinery
5. Trips and Slips
6. Crane and hoist operation

Due to time and resources constraints, Mr. Hoi’s study focused only in the following objectives:
1. To study SMS (Safety Management System) at a high-rise construction project in Vietnam
2. To study safety risk in construction of high-rise building in Vietnam
3. To analyze strength, weakness and propose recommendations for improvement of safety in high-rise construction in Vietnam

Conclusion

Throughout the core basis of safety literature and actual high-rise tower now under construction, the main important issues can be summarized as below:

(1) Summary of Safety Management System (SMS)
           
The SMS is a must for every construction project, especially for high-rise construction because this area is consisting of many latent hazard and risk. Without SMS, the owners, developers, investors, shareholders, and managers cannot reach the goal and target as expected. On the other hand, the contractors, suppliers, installers, and workers cannot fulfill and complete their mission.

In overall, without SMS, the construction of a high-rise will become very dangerous and the casualty/damage cannot be prevented. The SMS must be set up and strictly implemented and it should comprise of the main frames:
-          - Safety Policy
-          - Safety Organization
-          - Safety Plan & Program
-          - Hazard & Risk analysis and identification
-          - Safety Documenting & Recording
-          - Safety Review & Upgrading

In addition, high-rise construction project should also have strong and powerful PM/CM team who will monitor, control, and handle the safety matters (e.g. review and approval of safety plan/program submitted by the contractors and sub-contractors). It is also their duty to strictly implement these safety plans which normally and basically include the following: 

- Safety management/hierarchy/organization
- PPE availability, use and condition
- Scaffolding (fixed and mobile) including ladders & platforms
- Electro-mechanical activities and controls
- Site status
- Temporary power supply and tools
- Health & welfares
- Storage condition
- Fire prevention
- Waste/pollution control
- Monitoring and control of working on height
- Aid/first aid and evacuation
- Emergency plan for unanticipated circumstances

It is recommended that for bid and high-rise construction project, the owner should seek and hire a professional project management team usually PMC companies (project management consultancy), as the project & construction manager and their representative as well. The PM/CN then will be enthusiastically and heartily dedicated to the multi-goal completion of a high-rise construction project: schedule reached, within budget, quality achieved and also well perform the high safety requirements/demands.    

The PM/CM as the owner representative should have strong and effective ways to force all contractors and their subs at site to totally and absolutely comply with safety rules. It is necessarily to cleverly apply the method of fine and reward to guarantee the safe situation at site workplace.

(2) Summary of Hazard/Risk Identification:

This is the most important portion of every specific SMS especially for high-rise project. Depending on the specific condition and particular situation, the PM/CM should:

(i) Thoroughly analyze all aspect of the project: geographical, structure, sub-water, vicinity, surrounding inhabitants

(ii) Far-seeing and fore-seeing for all possible causes/reasons may lead to hazard/risk

(iii) Focusing in the most would-be hazard/risk of high-rise construction: fall/falling, trip/slip, fire, electrical shocking/flashing, tower crane/hoist, lift/elevator, scaffolding, PPE

(iv) Periodically and frequently (weekly/bi-weekly) conduct site-safety check carefully and thoroughly. The same for site-safety audit

(v) Evaluation the site-safety check/audit and requires improvements

(vi) Always available for an emergency plan to cope with an unanticipated circumstance (drill of evacuation…)

(vii) Always keep best relationship for availability of a hot-contact with nearest local authorities and utilities

(viii) Frequently review, analyze and search for other possible hazards and identification of its risks

(3) Strength & Weakness of the actual SMS at Pullman Saigon Center project

Strength:

-    - Strong and powerful: the PM/CM monitor, control and force the contactors & their subs to execute the safety rules.
-    - Standardized & professional: the safety rules & items based on the advanced standards/norms of site-safety and implemented by a long-history PMC like Turner.
-    - Sufficient: the SMS and its rules/items comprising the most frequent issues in high-rise construction

Weakness:

-     - Lack of identification of hazard/risk from some potential possibilities such as: glass wall, lift, sub-water, overhead power line
-     - No considering on the role of 3rd safety party for audit/verification
-     - Only involving the actions in construction phase.
-     - No mentioning the other phase: commissioning and delivery
-     - No mentioning on safety training, especially for induction training
-     -Take much time much, paper for meeting and inspection so the time schedule may be impacted.
           
(4) Suggestions & Recommendations

-     - Build-up a comprehensive safety plan and extensive safety programs: the plan should involve all factors that possibly cause risks and hazards of unsafe conditions.

-    - Strictly abiding and complying with local code and governmental regulations and stipulations.

-    - Build and maintain very good relationship with local authorities and utilities.

-    - Pay special attention on the geographical, geological, environmental, hydro-geological characteristics of the area, to foresee/ anticipate suitable counter measures and actions.

-    - PLAN – DO – CHECK – ACT: strictly and thoroughly executing the established safety plan/program; frequently review and improve for better outcomes.

-    - NO COMPROMISE on safety especially in high -rise construction.

-    - Ready for safety egress in site for rescue and emergency exit

-    - Emergency Action Plan: ready for reaction plan/scenarios to any unexpected circumstance/contingency; prepare plan, scenarios and evacuation method for readiness and coping with even the worst case might be happened: fire, collapse, seismic, terrorism

-     - Periodically organize training, re-training for emergency drill/rehearsal and contingency scenarios of evacuation.

-    - Check and review design for specific items which may cause risk of un-safety by professional 3rd party.

-    - NO SMOKING at construction site: so no hazard and no risk for fire occurrence. Of course we should strictly control and monitor all possible causes and reasons may lead to fire and explosive from materials and chemicals and from interaction among themselves.

-    - Increasing safety awareness: although we have rules, notices, regulations, fine sufficiently but the hazard/risk/accident are still be possible to occur. In order to avoid and prevent more and more the possibility of hazard, risk and accident, the awareness/perception on safety in high-rise construction of every involved people must be increased and enhanced.  

This can be got by education level of every worker, person participated on site. This can be increased by frequently training/re-training them on safety subject by various type: oriented safety, 15-minute tool-box meeting every morning, safety inspection daily, weekly safety audit, safety signs/panel/billboards/notice on site, safety lunch for every 100,000 safe-working hours.

-     - Motivation and incentives: similar to job and wage, performance and bonus; safety in high-rise construction needs to have encouragement to the people who are good examples for well-performed of safety on site. There are various ways/forms to enhance and support safety goal: safety lunch, safety lottery, safety award to the best-performed worker, bonus, pay-rise, promotion etc.

-    - More attention – less occurrence: the more attention on safety the less accident and problems occurred.

-   - Strengthen functions of employers and supervisors: employers and supervisors must ensure compliance with the provisions of the OHSA and its regulations. Key requirements for employers include:
(a) Employer

(i) instruct, inform and supervise workers to protect their health and safety
(ii) appoint competent persons as supervisors
(iii) take every precaution reasonable in the circumstances for the protection of a worker
(iv) prepare and review at least annually a written occupational health and safety policy, and develop and maintain a program to implement that policy if the workplace has six or more full-time employees
(v) post a copy of the occupational health and safety policy in the workplace, where workers will be most likely to see it

(b) Supervisors
(i) ensure workers work in compliance with protective devices, measures and procedures required by the act and regulations
(ii) ensure workers use or wear any equipment, protective device or clothing required by the employer
(iii) advise workers of any potential or actual health or safety dangers known by the supervisor
(iv) if required, provide workers with written instructions on the measures and procedures to be taken for the workers’ protection
(v) take every precaution reasonable in the circumstances for the protection of workers

* Frequently carry out preventing methods/measures for safety:
* Periodically check and verify crane/hoist by 3rd independent parties.
* Frequently training and certificating operators
* Review and amendment/adjusting safety plan/program from safety audits

-                      Frequently TRAINING on safety to all workers. Make sure them always to keep in mind that safety does not depend on luck or destiny but it depends on themselves. 

His thesis abstract is copied and pasted below.

Abstract

Construction is indispensable for the growing up of any country and cities. The more development of society/community, the more projects are going on. Construction industry brings up the new picture of country/city; attracts investors to come in and provides more jobs/incomes to people/community; especially for the under-developing countries.

However, construction industry is one of the most dangerous/risky economic sectors. In Vietnam, in the year 2011, official reports recorded that 5896 accidents occurred in construction led 6154 injuries included 504 severe cases with 574 deaths. (SG newspaper dated 26-June-2012). Note that 2011 is the year which construction was depressing nationwide due to the problems of high inflation and high interest rate. Further a certain accident amount was not put in the above official report.

 Accident cases from machines/tools always being a major percentage but deaths are mainly by falling and electric shocks. In most cases, the control of safety management at sites is not strictly, frequently slacken while the owner and contractors only focusing on completion schedule and profits; insufficient interest to safety for people on sites. Another part is from the lack of understandings/perception on safety of the workers themselves.

Everyone is aware on the important of safety, everyone is told about the preciousness of human being and many losses comes from the accidents; but casualties still be recorded. How to find out and apply an effective manner to minimize and – may be - eliminate all unsafe conditions and possible causes /risks of the would-be hazards?



33 comments:

Anonymous said...

thanks very much it is very interesting

Jason said...

Construction site safety is something that cannot be overlooked; people's lives should be the most important concern in any construction project.

Unknown said...

Thanks for the sharing of such information. I'm glad to have visited your blog and good to know you! I find it interesting and informative.
Higher education institution in Thailand

Unknown said...

This is really nice. Your information about constructions is really interesting. Thanks for sharing this article
Architects in Chennai

andrea chiu said...

Hi, just passing by your site to see something that will interest me and luckily you impressed me with your great article and I have a great time reading everything that is written. I'm looking forward to see more of your write-ups. If you have time you can also visit my site which indicated below.

nhella

www.triciajoy.com

andrea chiu said...

Hi, just passing by your site to see something that will interest me and luckily you impressed me with your great article and I have a great time reading everything that is written. I'm looking forward to see more of your write-ups. If you have time you can also visit my site which indicated below.

nhella

www.triciajoy.com

condo in manila said...

I've been surfing online more than 3 hours as of late, 
yet I by no means found any fascinating article 
like yours. It's lovely worth enough for me. Personally, if 
all webmasters and bloggers made good content as you probably did, the 
web can be a lot more useful than ever before.

Dandy said...

Thanks for sharing these great high-rise construction site safety tips. Falls are one of the most dangerous aspects of construction.

ayshwariya said...

Thank u for sharing this knowledge.
Every aspiring junior economist should read Atlas Shrugged. It's eerie how spot on she was in predicting things to come.....


first aid course

Safety Professionals said...

Safety is the best on the construction !!
nebosh course in Chennai

Unknown said...

this is impressive article about safety field,keep posting this wonderful information
Offshore safety engineering courses in chennai
Best industrial safety training institute in chennai

Unknown said...

Thanks for sharing the important points of view with us. It is really very nice blog which describes how to courses related to construction infrastructure

Dandy said...

Despite all of the safety precautions you can take, high-rise construction jobs will always be dangerous!

prmu said...

Thank you sir

Unknown said...

Its great article to post nice blog!!
nebosh course in Chennai
Industrial Safety courses
Nebosh safety courses in Chennai
Fire and safety courses

Security Guards said...

which mainly focused in safety aspects to come up with the solutions on how to control risk and to prevent accidents as much as possible as well as to foresee/handle emergencies/contingencies during the construction duration.
•°*”˜˜”*°•. construction site security

Unknown said...

The slump in the housing market has had far-reaching effects. Home prices have fallen significantly on existing homes, especially because there are so many foreclosures on the market. It has also affected new construction, including affordable housing projects.
see more details : sewer tie in southeastern, ma

Anilkumar said...

It's so great and appreciable to share more knowledge for new safety professionals.Especially it's providing great awareness about Safety Management System.And also mentioned about potential risks and hazards in civil construction industry.Underline cables and pipe lines also too dangerous as overhead electrical cables. So must be consider this also during excavation operations.

Thanks and all the best.

john smith said...

You need it nice and thin and an even surface area of the ink, so its almost tacky. health & safety london

Anonymous said...

Thanks! That's valuable information!

Check out also our blog post about health and safety in construction.

evergreensumi said...

Those rules moreover attempted to wind up plainly a decent approach to perceive that other individuals online have the indistinguishable enthusiasm like mine to get a handle on incredible arrangement more around this condition
industrial safety course in Chennai

Swethagauri said...

Those guidelines additionally worked to become a good way to recognize that other people online have the identical fervor like mine to grasp great deal more around this condition.
nebosh course in chennai

gowthunan said...

I’m experiencing some small security issues with my latest blog, and I’d like to find something safer. Do you have any suggestions?
fire and safety course in chennai

sunshineprofe said...

Needed to compose you a very little word to thank you yet again regarding the nice suggestions you’ve contributed here.
iosh course in chennai

Anonymous said...

Topics are so useful i did read all. I find it interesting and informative.
Surya 9563655555.

gowthunan said...

Do you mind if I quote a couple of your posts as long as I provide credit and sources back to your blog?
nebosh course in chennai

anvianu said...

I look forward to fresh updates and will talk about this blog with my Facebook group. Chat soon!
safety course in chennai

nebosh course in chennai

תבניות קלות לבנין said...

Numerous of things need to be implemented in order to bring the safety at the construction site so working with the helmet will protecty you from the head injuries and wearing the construction attire is also must at the time of working at the heights so as to avoid from the injuries.

Shivika Rana said...

Thanks for sharing about safety measure Crane Service
Farana Crane
Crane Hire
Crane Rental

williamoliver172 said...

This blog is truly useful to convey overhauled instructive undertakings over web which is truly examination. I discovered one fruitful case of this truth through this blog. I will utilize such data now. Certificate 4 In Construction

syam kennadi said...

Nice blog.Thank you for sharing valuable information. Keep update with your blogs...
Gantry Cranes

Rajesh Kumar said...

Good post regarding safety in construction place. Construction site is a place where safety measures are must to avoid accidents. Construction safety signs and safety equipment should be made mandatory.

karthikthru said...

hi