In
Vietnam, recently, there are some PMLG/PMLES projects which show a perspective
of responsibility in protecting the environment both from Government Agencies
and Non-Profit Organizations. However, there are also problems that affecting the
projects.
1.
The
market
2.
Commercial
3.
Dependence
on Local Government’s Policies system
4.
The
resource
5.
The
techniques and technologies systems
6.
The
real-life experience
The Project Management Lifecycle for Green building
(PMLG) is the expectation of the 2nd
Green building generation, while the Project Management Lifecycle for Energy
Saving Green building (PMLES) is the objective of the 5th energy
generation. PMLES is large representation sample of PMLG in which they can
maximize the energy saving and minimize the cost for design and construction by
using less energy & water in their own lifecycle. There is a difference
between PMLG and PMLES in which PMLG is long-term strategy vision, while PMLES
is short-term tactics of situation solution in Vietnam. But in reality, PMLES
is a part of the PMLG’ spectrum.
As a result, all stakeholders of the project need to
understand thoroughly how the Green issues must be implemented during the PMLG
– especially that the Green concept is created in the plan and design stages,
and that will strongly affect the next stages as tender, construction, maintain
and renovation stages.
Furthermore, a building can only be called PMLG/PMLES
once it is certificated by an independent third party such as VGBC and/or
ECC-HCMC (Energy Conservation Center of Ho Chi Minh City or Ministry of
Industry and Trade of Vietnam) in which the Rating System depends on the 2nd Green building generation’s standard and
codes (refer to Post-New York Zoning Law).
Mr. Nguyễn
Anh Tuấn made a case study aimed to :
1. identify what drives Green
projects
2. identify the PMLG development.
3. find out the problems and benefits
of the PMLG/PMLES in Vietnam; and to propose analysis and solutions for
the problems/issues.
4. propose a framework to
implement the PMLG/PMLES in Vietnam.
Conclusions
During
the past ten years, the energy saving criterion and energy using efficiency of
Vietnam has been becoming the national aim program through Agreement No:
21/2011/NĐ-CP issued on 29 March 2011.
In
this report, the author wanted to show the world trend to assess the green
building based on the PMLG process. From that, there are efficiency methods to
examine and evaluate the long-term project for the design or urban through its
impact with environment in whole lifecycle of green building, since PMLG is
expected to meet the requirements of owner, and PMLG is the result of the
enhancement of PMLES process which is large representation sample of the PMLG
process. Moreover, the scope of PMLG may be narrow, for example, it’s not only
the maintenance policies of building energy saving but also the expansion in purchasing,
cleaning, recycling of office waste and equipment.
The
PMLES is one of the criteria terms of Lotus tools. Therefore, PMLES’ solution
is usually based on Eco-charrette process and Building Performance Simulation
(BPS) to exactly assess and respond to the selected solution of PMLG, because
PMLES are qualitative from the design stage to achieve aims as per as the
following objectives:
1st Objective: In reality,
there are three main factors to drive green project such as following:
(i)
The countenance and incentive from
Government is the most motivation factor to rapidly expand the green
industry. However, Vietnam has the higher cost which is the serious barriers
and obstacle to attract developers and others. So, how can these problems/issues
be solved? In order to encourage the developers and others, the most efficient
solution supported by the government and community in each term of the payment
is that they can promulgate the good tax policies and deliver the special
permission with a short time approval.
(ii)
Green building perception in community: the
Eco-charrette model is recognized in comparing the investment of new buildings
to the conventional buildings and existing buildings in which they have been
creating a long-term financial saving for green building and returning more
effectively in investment initial capital to increase the lifecycle efficiency
of new buildings.
(iii)
To reduce energy consumption through operation stage
and maintenance: The
green buildings require a higher capital cost to design and build. On the other
hand, in long term plan, the sustainable building experts assign that the
potential green buildings reduce operational and maintenance costs which are equal
or has lower capital cost through building’s lifecycle. Moreover, the financial
motivation in building energy efficient buildings is recognizing the difference
between latent energy use and consumption.
2nd
Objective:
the site for green building is one of the ten criteria which is of first
importance of Lotus tools. Thus, in order to identify PMLG project for green
building project development, the project must be connected with
environment. Moreover, when we apply to Eco-charrette model which has
critical situation in both pre and post-construction, we have to know for sure
that the objective of both building and organization is met as well.
(i)
The project
team may consider the use of appropriate environmental management systems for
new green buildings and refer it to International environment standard ISO.14001
and Lotus tools.
(ii)
Many other
criteria which can be also applied to existing buildings as ISO. 50001.
3rd
Objective:
Landmark building brought the perceived benefits in reducing running cost and
energy cost generally, particularly and dramatically; increasing health and
reducing safety risks to occupants by improving internal/external environment,
etc.; improving productivity and enhancing trade name for the organizations
which involved in projects. It’s easier to lead the higher rents because of
market distinction and a more attractable building, especially reduce the
capital cost of construction. However, Vietnam has the problems/issues that need
to have appropriate solutions for pre-design stage, design and post-design
stage.
(i) In the Pre-Design stage:
As the prerequisite for successful
green building that is trend of the age, we should have to:
a.) Using Design
goals about Green building to affect the PMLG process.
b.) Performing
criteria effectively as solution tools.
c.) Budgeting
d.) Scheduling
e.) using
successful criteria
f.) other
supporting information (as BIM)
The
project team should apply Green criteria efficiently. In this stage, the team
should access, review and develop object of the OPRs. At the same time, all
consultants (including green consultant) must perform completely.
(ii)
In the Design stage: Steps of concept
design and design development must be applied by Green criteria as follows:
a.)
Using the concept of Integrated Design Process (IDP) and Commissioning Process
to manage and control the project.
b.) Using the
design checklist.
Next
steps are:
a.) MEP (election: water, envelope, ventilation, etc.)
b.) Architecture
(façade, material, etc.)
c.) Structural
Building
d.) Interior
e.) Landscaping
systems
(iii)
In the Post-Design stage: Project environmental control plan
a.) Waste management
b.) Air pollution control
c.) Noise control
d.)
Vector control
e.)
Conservation of natural resource
f.)
Emergency preparedness for environmental accidents
g.)
Environmental records
At
the same time, developing the system test, O&M and manual Building users’
guide system are facilities of the building.
In
that case study, The Landmark Building was built for very long time, so it was
innovated to implement the green building assessment system. Through the
proposed framework and case study, we can see that the whole team was assigned
and green building assessment system is also selected at the pre-design stage.
Therefore, the green criteria will be developed by Green Consultant. To meet
the OPRs, the green criteria becomes the key or norm for all team in order to
operate the PMLES successfully.
4th
Objective:
In order to operate PMLG/PMLES in Vietnam, we are supposed to adjust extra
framework from PMLES process (Figure 1) to PMLG process (Figure 2) when we
applied to Eco-charrette model (Figure 3.3). Thus,
(i)
Eco-charrette is a jargon group that talks about a model of
organization. They agree in corporation to change from old process to new
process which has 26 prerequisite conditions and criteria. From a negotiation
meeting with stakeholder, we can identify a route clearly and which new process
will be belong to from the beginning to the end. Moreover, this project team
has to collect database in design stage.
(ii) It’s obviously; the key of this study report
framework is new Eco-charrette concept. Especially, when we apply to
Eco-charrette model for new project or existing building in which we need to
have been understood and implemented thoroughly. It means that the whole Green
Consultants Experts should be participated in the beginning and early.
Recommendations
1.
For the PMLG
in this report
In
order to implement the PMLG in Vietnam, we must study the theories and the
recommendation on the efficiency of Green building such as follows:
(i)
In the Developing Country like Vietnam, the PMLG is a new knowledge for
all and at the same time, they are also short of the technique and technologies
because of no previous Green building like this. Besides, the Government should
promulgate or approach the climate data for using Building performance
simulation tools.
(ii) The Law of Vietnamese Construction
should have the basic requirement to catch up with the environment
problems/issues as trend of the Green issues.
(iii) The Government
and community should have to find out how to supply the PMLG’s information for
all residence to basically understand it.
(iv) Because Vietnam
is at the tropical region, architecture must depend on weather and climate in
this area. Moreover, PMLG’s solutions include advantage and disadvantage such
as:
a.) There are tropical forests: bamboo,
coconut
b.) There are lots of natural materials:
sand, refined brick
c.) There are lots of natural energy: solar, wind,
tide, geothermal
This
is the favor of the natural resource with very cheap cost which they can be
reused to avoid environment degradation.
On
the other hands:
a.)
In Vietnam, thermal outdoor is always higher than the comfortable temperature
area which base on the Webb Chart or Psychometric Chart.
b.) Because it’s in the tropical region,
monsoon/windy season has high humidity.
c.) It is
inadequate both modern technology and forecast on environment depletion.
As
the results:
1.
Needing to integrate the concept of Eco-charrette, it means that the aspects of
architectural design applied to technique and technologies to carry out
efficiency perfectly and understand throughout about concept of mechanical aspect. It will make the PMLG more
effective.
2.
In PMLG, the Green experience and Local condition should be selected by the
developer for the good project team that will affect the project in order to
reducing and eliminating the risk for the project.
3.
The PMLG brings the long-term benefits. So, when the PMLG start with involved
parties, they should think about the Green because this is key issues of the
developers. The investors need to know what they will invest directly into the
project with their money.
4.
Finally, in response to demand for a high quality, the PMLG requires the
project team to have transparency, concise organization, role, duties and
responsibilities in order to avoid the confusion and conflicts. Moreover, the time
and cost overrun will not happen.
For
further study
Now, the big picture of Green Building in
Vietnam is only portrait during the period of national industrialization and
modernization. This report has just explored the general issues in
implementation of the PMLG because of limitation of the scope and time of this
study.
In
order to build many green building project in the construction industry,
investment in Green Building practices may be a leap of faith. Further research
and successful examples of sustainable building will have a challenge for the
developing technology and provide direct proof of its economic and
health-related benefits, and encourage its greater adoption. Moreover, they
have more analysis on the specific of the PMLG to prove the efficiency of this
strategy which should be managed. In addition, the higher rate of the Green
Building’s project should be also studied in comparison with the normal
project. They have more confidential factors in encouraging the
one who wants to involve in the PMLG.
To
sum up, more studies on PMLG have to be conducted in order to compare more than
the convention building, so that we will have enough spectrum for sustainable
developments of PMLG.
His thesis abstract is
copied and posted below.
Abstract
In
the first decade of the 21st Century, the Human face to challenges
which demand them to support more their own responsibility. As we have to face
not only too many opportunities which we have been living in, the fourth modern
age of the technology revolution, but also too many challenges such as the
resource depletions, greenhouse, pollution environment, climate change and so
on. But there are some disasters coming from ourselves. Therefore, obviously,
we choose this topic to response for the question of the Project management
Life cycle for the Green building is really truth. The report focuses on the
two problems suffered: minimizing or reducing impact on nature and requiring to
adapt with changes, since the natural resource cannot restore its original
source.
Nowadays,
we usually talk about concept of the sustainable development which is willing
to do something without damaging to environment. This concept is very large and
complex which has Green building and tradition as well as a part of concept
above. So, this report is awared to explore the main issues. Because of the
short-time and narrow scope, we have only approached to foundation which based
on the main issues in the implementation of Green building assessment system
such as: LEED, BREEAM, CASBEE, BCA Green Mark, and especially the Lotus tools
of VGBC, ECC-HCMC which have been operated in construction environment in
Vietnam.
From
that case, we learned some helpful lessons and use them as the historical data
and references for other green buildings.



3 comments:
This is really wonderful article. I am glad that I’ve found this helpful post. Thank you for this one.
This is really good news. I hope they can continue serving for the future.
Congratulation for the great post. Those who come to read your Information will find lots of helpful and informative tips. Tim hornibrook
Post a Comment