On February 18, 2012, MPM celebrated its 5th year anniversary in HCMC with participation of almost 150 guests including MPM alumni and current students, faculties, President of AITAA Mother Chapter in Thailand, representative of AITAA Vietnam chapter in HCMC, representatives from authorities and corporations in Ho Chi Minh city and southern provinces and AIT, AITVN staffs. Present at the ceremony were also sponsors from popular domestic and foreign construction companies including Gold sponsors from Promana, BTA Investment, MPM JSC., and Classic sponsors from Saigon Construction Quality Control JSC. (SCQC),Vinson, Nam Thinh M&E, Wiik-Hoeglund (Thailand), and more.
Participants in MPM 5th Year Anniversary - Majestic hotel, Ho Chi Minh city
Present from Mr. Nguyen Sinh Khang (alumni from MPM2-Vung Tau), Vice President of PetroVietnam.
Speech from Mr. Chawalit – President of AITAA Mother Chapter
One of MPM 5th year anniversary in HCMC’s activities was a tennis tournament for MPM faculties, alumni and current students with main sponsor came from Mr. Tran Duc Quang, MPM3B-HCMC. The double-man tennis matches were conducted in the morning 18 February 2012 at First Hotel Tennis court with participation of 24 players.
The tennis tournament price have awarded at the ceremony of MPM 5th year anniversary in the same evening. The champion has also received incentive price from Ms. Mai Do Thuy Dung, MPM1-HCMC with 1 free night at Hyaat Regency resort, Da Nang city.
1. Champion: Mr. Vo Dinh Nguyen - MPM3B-HCMC
Mr. Le Van Thong – MPM1-Vung Tau
2. 2nd Runner-up: Mr. Hoang Manh Chi – MPM4B-HCMC
Mr. Pham Hai Chien – MPM5A-HCMC
3. 3rd Runner-up: Mr. Tran Duc Quang – MPM3B-HCMC
Mr. Ho Khue – MPM5B-HCMC
Mr. Nguyen Hoang Anh Chuong – MPM2-HCMC
Mr. Nguyen Ngoc Thi – MPM4A-HCMC
Participants in tennis tournament
MPM Tennis tournament – Champion award
This is a blog managed by Construction, Engineering and Infrastructure Management (CEIM) at Asian Institute of Technology, Thailand. In this blog, CEIM shares our activities in providing excellent professional project management education at Master and Doctoral levels in Thailand, Indonesia and Vietnam. http://www.set.ait.ac.th/ceim/
Friday, 24 February 2012
Sunday, 19 February 2012
PROJECT
MANAGEMENT IN HIGH RISK BASEMENT CONSTRUCTION
A
CASE STUDY OF CONSTRUCTION PROJECT
IN
HA NOI CITY, VIETNAM
By
Tran Xuan Canh
Abstract
In civil and industrial
construction, the deep basement construction now contains so many risks and
difficult and complicated works.
To minimize the risks can be
happened during deep basement construction; we should fully and clearly
research the hidden risks for this work as well as give out the suitable
solutions and how to apply those solutions during construction and to reduce
the disadvantages of those risks to the minimum.
A full and exact research on
risks and the method to manage the risks and also the project management during
the deep basement construction is very necessary and urgent.
This project report studied about
project management in high risk basement construction.
Executive summary
Rationale of research
This research has been conducted to identify risk in basement
construction of high rise building.
Objectives of study
To study project planning and control to
understand risk in Royal city Project, Hanoi by studying strengths &
weaknesses in planning & control practices.
Propose framework for planning & Control in
basement construction for high rise.
Methodology
The exploratory research method is used to study risk management
in basement construction and the current Vietnam regulations for quality
management in construction projects.
Findings and conclusion
To
obtain the best efficiency for the project and to minimize the possible damages
for the project and the neighboring buildings, we should have a suitable risk
management system (RMS) to implement in the project to ensure that the project
is operated in the best and safest way to gain full targets of the project:
Safety – Quality – Process - Efficiency.
The
deep Basement construction needs to be done by the Professional Contractor with
a full knowledge about the possible risks and there is a methodical and full
control system about this issue.
The
implementation of the risk management system (RMS) also requires Client and
Contractors to accept the necessary costs to maintain and to operate this
system. However, these costs are necessary and proper to ensure the safety for
the project.
Recommendations
To
achieve the best effect of the risk management in the project, we should take
some steps:
For
Client
·
Establishing
risk management system (RMS) for projects and ensure the system is properly implemented.
·
For
collecting data of the contractor, requesting Contractors to submit the risk
management system/policy comply with the requirements, conditions of Client for
the project in the file bid. Client should collect the contractor that has
enough ability to implement the project.
·
While
checking RMS of client & contractor there is need of third party throughout
implementation to check both.
·
Need
to have the insurance contracts for the project and related parties with
Insurance Company.
For
Contractor
·
Establishing
the RMS with the most suitable policies, strategies for the project and to well
comply with the requirements of Client and the legal regulations and the policy
of the company.
·
There
is a serious combination with Client and related parties throughout the project
implementation to ensure the best maintenance of the risk management for the
project.
·
Establishing
and using the suitable tools to manage the risk for the project in order to
analyze the reason of the incidents on site and to get the solution to avoid,
minimize the damages the most effectively.
·
Using
Risk strategies effectively share the risk with third parties as the insurance
company or to require Client to be responsible for some risk of the project.
·
Giving
out the detail classification for the risks may be occurred for the project,
defining the reason to give out the most suitable solution to avoid or minimize
the influences of the risks.
·
Establishing
the most suitable and effective Risk Organization Chart for each project and
establishing the most effective plan.
·
Establish
reward and penalty system to reduce the risk in project.
·
Having
the most suitable Method Statement for the project to minimize the risks
·
Developing
the human control with the suitable management measures to ensure that the
staffs are collected and used for the most effectively for the project,
·
Have
to have the insurance contracts for workers, equipments of Contractor and third
party on site with Insurance Company.
THE DELAY FACTORS DURING
CONSTRUCTION PHASE OF
A RESIDENTIAL PROJECT IN BINH
DUONG, VIET NAM
CASE STUDY OF AN DIEN
URBANIZED RESIDENTIAL COMMERCIAL ZONE
By
Bui Viet Thi
Abstract
A project is considered to be perfectly
performed when it obtains three basic criteria such as completing on time
within the planned budget, ensures the required quality such as winning the
customer’s demands and meets labor safety requirements successfully in the
performance stage. However, all the residential zones built in Viet Nam
have had problems of project management leading to construction delays. Giving
solutions for these problems has become project manager’s integral
requirements.
Delays in construction projects are able to be solved. In striving
to give solutions for these problems, the significant factors influencing badly
construction duration should soon be found out. Therefore, it is very critical
to form a systematical approach that should be applied as a device for the
investigation.
This report will evaluate and analyze twenty factors
which caused delay matters at Residential Zones and were fulfilled at Ben Cat
District Binh
Duong Province .
The qualitative methods will be used, basically based on the principal of
evaluating the risk level of factors having a negative influence on the
construction schedule of the Residential Zone. It is conducted to realize the
objective of the study.
Finally, some solutions to deal with delay
problems in the construction duration of projects are given in the text.
Executive summary
Rationale of research
This research has been conducted to identify factors causing
delay in construction projects during construction phase.
Objectives of study
To study and analyze delay happening in
residential area An Dien
Commune, Ben Cat District, Binh Duong province. Recommend strategies for
improving project delivery.
Methodology
Case
study approach is considered a major philosophy. In addition, many sources of
data will be collected in this study and project reports, documents from local
authorities and related agencies, construction standards, and exploratory
approach by reviewing available literature to deploy the research of
construction delays at Binh Duong and Viet Nam.
Findings and conclusion
By analyzing factors to
affect delay in the project, this research showed the problems causing delays
in construction stages. This research has identified that delays of the
projects were originated from survey stage till construction one. From these
result, most delays have generated from
the project owner who is responsible for inexcusable and excusable delays with
some compensability and non-compensability.
In this project, the owner committed some
mistakes in blown-off leveling process due to improper planning and slowness
decisions given. Then, the owner lacks of qualification and experiences to
nominate main contractor, suppliers and Tender Prequalification consultants, to
draft Specification resulting in disagreements amongst sub-contractors and fraudulent
tender occurring. Also, to deal with uprising problems related to surrounded
inhabitants and environmental protection, the owner was not activated and
flexible in those eventualities, failed to avoid disputes happening.
In case of the study, the project
has 20 factors causing delays in the construction process of An Dien
Residential Zone. Delay related to accident of labor safety is so serious,
delay related to material delivery is mean effect, and delay related to
break-down of machineries and equipments had smallest impacts to the project.
Suggest
for future research
The research has analyzed the factor of delays,
reason / severity rate and solution for each cause of delay problem in this construction
project. Hence, the similar study can be realized in different type of project
such as: Apartment- zone, Resettlement project, etc… in Viet Nam .
Management
of Road System Construction under the General Construction Planning by the year
2020 of Cau Giay District, Hanoi City
By
Le Van Thu
Abstract
The district of Cau Giay is one of Hanoi’s districts achieving
high-speed urbanization level. Along the district’s urbanization process, many
new traffic systems have been constructed and developed, contributing to
renovating and modernizing the general urban picture of Hanoi in general and of
the district in particular. However, beside the achievements, there remained a
lot of weaknesses in the district’s construction and management of urban
traffic systems, especially in that of road systems. This study points out the
significant problems existing in Cau Giay’s construction and management of road
systems. Among those is the development of road systems in the districts are
not catching up with Hanoi’s current urbanization process.
In fact,
the construction and management of urban landscape along the district’s streets
is not efficient. The local technical infrastructures in some areas of the
district are not modern and synchronous enough. There remain a lot of problems
in the activities of technical infrastructure construction management in
accordance with the district’s general construction plan. Based on the facts
and figures, the study refers to the theories to describe the roles of road
systems in the city’s urbanization process as well as the role of planning road
networks in the city’s general urban plan. It also mentions the requirements
and legal basis of road system management under the general construction plan.
In the
following part, the study use Cau Giay as a case study for this topic, in which
solutions to all the existing problems in the district’s road systems
management are analyzed so that the road system development is in accordance
with the district’s general construction plan by 2020.
To the study’s conclusion, it is essential to build traffic
systems synchronized with the district’s other technical infrastructure
systems. At the same time, there need to pay more attention in improvement of
the local residents’ compliance with the regulations on construction. In
addition, the study also emphasizes that importance of building short-term
investment plan within the long-term plan for road system construction and
attract the other investment sources beside the state budget by encouraging the
various investment firms such as BT (Build- Transfer), BOT (Build – Operate –
Transfer) and BTO (Build – Transfer – Operate).
Executive summary
Rationale of research
This research has been conducted to identify problems in road system of Cau Giay
District, Hanoi City.
Objectives of study
To study, analyze and assess road
system construction under the general construction planning of Cau Giay
District, Hanoi City. propose solution to improve efficiency the general
construction planning of Cau Giay District, Hanoi City.
Methodology
The exploratory research method is used to study road management
Cau Giay
District, Hanoi City and the current Vietnam regulations for road management.
Findings and conclusion
Management of the road system under the construction
planning is a complicated work and relates to a lot of sectors. The road system
construction planning management may be assessed comprehensively as follows:
Attained
results: Some new roads have been planned and developed in accordance with the
approved planning, forming beautiful, modern and sychronous streets for
technical infrastructure and landscape, settling difficulties occured from the
urbanization process. Management of construction planning has been regulated
and improved suitable to the practice for the first step.
Shortcomings:
Beside the attained results in the road system managementconstruction planning,
there are still shortcomings to be settled: construction of many roads is in
confusion, not in accordance with the planning; the spontaneous building of
works along streets still exists and is not timely prevented. The reality
requires strenthening management of construction planning of the road system
re-organization of construction administration agency, improvement of
inspection and supervision of construction in conformity to the planning,
supplementation and completion of regulations on disciplines for violations in
road construction.
Therefore,
we have to correctly assess the real situation of the construction and
development of the road system subject to the construction planning to give
solutions for effective management and construction, contributing to and
accelarating the developement of Cau Giay District in coming time.
To conclude, it is very neccessary to manage the
construction of road system in Cau Giay District under the general construction
planning in order to improve the living standards, conforts and create
favorable environment for urban inhabitants.
Therefore,
the topic “Management of road system under the general construction planning by
2020 in Cau Giay district, Hanoi city” aiming at proposing measures on
management in order to increase the efficiency of road system construction in
accordance with the general planning of Cau Giay district. This topic is
practical and high feasible in order to speed up the urbanization of Cau Giay
district; at the same time, solving inadequate situation caused by the
urbanization. In addition, the topic has specialized and completed measures on
management of road system construction and local reform, serving practically
the economic, cultural and social development of Cau Giay district in
accordance with Hanoi Capital planning by 2020.
Recommendations
- In the investment and construction of road system, besides the construction of new urban areas, it must be focused on the investment of infrastructure reform with existing construction area.
- Routes must be defined the heart and boundary line that have been approved and closely managed, avoiding re-occupying and violating boundary line.
- Positively taking part in the completion of legal document system on management of urban construction planning as well as management of urban roads; proposing difficulties during the execution; simultaneously, increasing the work of construction management as planned.
- Increasing capacity of management, adding power and responsibilities of ward-level authority in the work of management of road system construction and management of road boundary line.
Monday, 13 February 2012
cost estimation problem in FS and FEED phase of
thermal power PROJECTS
A CASE STUDY OF
thai binh 2 thermal power PROJECT
By
Tran Viet Sinh
Abstract
The
accurate determination of investment capital and project costs in all projects
as well as its stages has strong affect to the project success and efficiency.
The required levels of accuracy of project cost estimates vary at different
stages of project development, ranging from ball park figures in the early
stage to fairly reliable figures for budget control prior to construction.
Since design decisions made at the beginning stage of a project life cycle are
more tentative than those made at a later stage, the cost estimates made at the
earlier stage are expected to be less accurate. Generally, the accuracy of a
cost estimate will reflect the information available at the time of estimation.
The
project cost estimates may be viewed from different perspectives because of
different institutional requirements. In spite of the many types of cost
estimates used at different stages of a project, cost estimates can best be
classified into three major categories according to their functions. A project
cost estimate serves one of the three basic functions: design, bid and control.
For establishing the financing of a project, either a design estimate or a bid
estimate is used.
1.Design Estimates
For the owner or its designated design professionals, the
types of cost estimates
encountered run parallel with the planning and design as follows:
- Screening
estimates (or order of magnitude estimates)
- Preliminary estimates (or conceptual estimates)
- Detailed estimates (or definitive estimates)
- Engineer’s estimates based on plans and specifications
for each of these different estimates, the amount of design information available typically increases.
2. Bid Estimates
- Preliminary estimates (or conceptual estimates)
- Detailed estimates (or definitive estimates)
- Engineer’s estimates based on plans and specifications
for each of these different estimates, the amount of design information available typically increases.
2. Bid Estimates
For the contractor, a bid estimate submitted to the owner
either for competitive bidding or negotiation consists of direct construction
cost including field supervision, plus a markup to cover general overhead and
profits. The direct cost of construction for bid estimates is usually derived
from a combination of the following approaches.
- Subcontractor
quotations
- Quantity takeoffs
- Construction procedures.
- Quantity takeoffs
- Construction procedures.
3. Control Estimates
For monitoring the project during construction, a control estimate is derived from available information to establish:
- Budget estimate for financing
- Budgeted cost after contracting but prior to construction
- Estimated cost to completion during the progress of construction.
For monitoring the project during construction, a control estimate is derived from available information to establish:
- Budget estimate for financing
- Budgeted cost after contracting but prior to construction
- Estimated cost to completion during the progress of construction.
In this
study, the author shall focus on the cost
estimation methods in the view of the Owner (Design estimate), with reality
project case study of Thai Binh 2 Thermal Power Plant Project.
Executive summary
Rationale of research
This research has been conducted to identify problems in cost
estimating for EPC contract
Objectives of study
To study different estimating methods from FS to FEED phase,
Government regulation which affects estimation.
Discuss strengths and weakness, to propose frame work for accurate
estimation for power plant projects.
Methodology
The exploratory research method is used to study problems in
cost estimation of thermal power projects in Vietnam and using case to study
about frame work for estimating in thermal power plant projects.
Findings and conclusion
As the power plant
projects in Vietnam are invested by Government, so total cost from FS to FEED
should comply government rules and regulations. The application of the Vietnam
government regulation in determining the total investment and total project
cost of the thermal power project, also raises some of problem
·
Equipment
Cost is usually estimated too low (compared to similar international projects)
·
Policies
and cost rates of layout clearance, compensation and resettlement is not close
to reality price which leads to almost of the thermal power projects have
encountered obstacles to hand over plan and causing project delays.
·
Cost
consultants and project managers is low due to excluding the cost of foreign
consultants
·
Contingency
cost is determined too low.
The method of
estimating the total investment and total project cost of thermal power project
is combined methods, including some of the following main steps.
·
Breakdown
total cost to subdivision of cost areas.
·
Quantity
takeoff is determined basing on the basic design for FS phase and the FEED
design for FEED Phase. If design drawings are not available, the quantities are
calculated with references to similar projects already executed.
·
Detail
cost determination.
·
Applying
the government rules and regulations into the project to identify sub-divide
the areas cost of project.
·
Summarize
total project cost estimation.
Recommendations
·
In the thermal power project, the imported equipment
and materials cost is a large proportion of the total cost of the project, so
the currency in calculation and approval of total project cost is recommended
to use two type of money in the spreadsheet which is VND and USD. Amount in USD
which is used for the purchase of overseas equipment/material. This reduces the
risk causing by variation of exchange rate (always increasing) between VND and
USD for investors.
·
Management and consulting Cost of projects need to
be supplemented the unit price for the foreign consultant
·
Policies
and unit prices application for compensation must be consistent with the actual
market price; residential land can be compensated under once with the real
market prices. With agricultural land compensation policy of the State should
pay for farmer in yearly based on the profits of farm products on the land.
·
Contingency
cost applied in FS stage is minimum rate of 20%; For the FEED is 10%, as same
with international project cost estimate.
·
Electricity distribution prices to consumers in Vietnam
are now too low. PPA (Power Purchase Agreement) between investor (PVN) with EVN
should be low. Therefore, the investor has pressure to reduce of total
investment and total project cost estimates to meet the economic criteria of
the project (IRR, NPV).
·
In the technical engineering design (FEED) and
bidding documents, OWNER should define the origin of Equipment. Estimator can
determine the equipment cost in a more accurately.
Quality
Management System of Project Owner
A
Case Study of Bong Do Housing Development Project
By
Pham Viet Cuong
Abstract
Report shows
the basic concepts of quality management systems in general and quality
management systems in construction industry in particular that is an important
factor for an organization to develop and build trust with customers.
In
addition, the report also mentions the benefits of application and development
quality management system of an orgnization. Based on the basic theories of
quality management systems, this report has studied the application of quality
management system of An Lac JSC, a company invests in real estate sector. At the same time, the report also analyzes
the major problems that arise during the application of QMS and give solutions
to solve these problems and the strengths and weaknesses of An Lac’s QMS.
The
problems and solutions are given in this report, although limited, will help An Lac JSC understands quality management system
which they are applying, from which propose the necessary
adjustments to enhance and improve this system.
Executive summary
Rationale of research
This research has been conducted to identify the problems in
Quality Management System (QMS) for project owner in housing development
project.
Objectives of study
To study Quality Management System (QMS) of Project Owner (An Lac
JSC) in Bong Do housing development project from design to construction stage
and to analysis the major problems of QMS of An Lac JSC and propose the
solutions to solve these problems.
Methodology
The exploratory research method is used for literature review,
to study and analyze QMS, quality policy and measurement, analysis and
management.
Findings and conclusion
From the Case Study about the existing Quality
Management System of An Lac JSC, it is observed that An Lac JSC has established
the QMS that embraces the procedures from Design stage to Construction stage to
ensure that work quality of each stage is controlled and managed well.
At Design stage, the procedure is established to the
guideline for controlling of the design to ensure that the designs are complied
with specifications, law and customer requirements including time schedules.
Scope and responsibility of Design Control are also regulated clearly in
procedure. A Lac JSC has established the Design Team Management that governed
by Chief of Department to control the Designs of the Company.
At Tender Stage, the procedure is established to ensure that the Company
has a good contractor who has capacity, ability, performance and good quality
control system to support the Company Project. Fully responsibility of this
stage is of Economy - Planning - Investment Department (The Planning Team
Management) that includes investigation, evaluation, and selection of
Contractors for Company Project.
At
Construction stage, the procedure is established to ensure that the Company has
a good Construction Quality Management process during the execution of the
Company Project. This stage is controlled by Project Management Unit (Project
Management Team) that governed by a Project Manager who is the representative
of Owner on Site and has overall responsibility for the project management. The
Project Management Team is responsible that the quality of buildings
construction of the project conforms to the client as well as owner
requirements and the project is completed on time.
However, the existing Quality Management System of
An Lac JSC still has problems relating work quality from Design stage to
Construction stage that impact significantly on quality of project company,
including unclear requirements at design stage,
change the design, error of Bidding documents at
tender stage, or scope of work (missing contract review) at construction stage,
lack of process control, lack of quality records, etc.
In additional, besides the reasons of lacking of
work procedures, another reason is that heterogeneous perception in quality
exists in mind of staffs as well as leaders of An Lac JSC. So, it is necessary
to conduct the internal quality audit and provide training at different
position in order to gain the same level of quality perception in An Lac JSC.
PROJECT
DELAYS IN CONSTRUCTION TAXIWAY S1
IN
NOI BAI INTERNATIONAL AIRPORT
By
Nguyen Xuan Thang
Abstract
Construction
mismanagement results in multiple problems that can cascade throughout the work
force chain, affecting the schedule and leading to damages to multiple parties.
Although the problem may start with a single subcontractor, it can result in
all contractors feeling some impact to their work.
The actual
delays causation occur in all kind of activities, but mostly in technical and
management mistakes. The most important part comes from information,
documentation and staff management. The impact from details engineering and
purchasing materials are mainly related from the mismanagement of this process.
The
construction schedule updating and forecasting can handle the uncertainty
associated with quantifying activity delays and their impacts. The conditions
in the schedule, that they are able to react and take the appropriate
corrective measures to avoid and minimize delays.
The
construction firms and the contractors need to feel in the same rhythm of their
project. Especially in large and sophisticate project, our desire to complete
the works on time and within budget is hard to fulfill. We can only achieve
this goal if we have the experience, competence staff and numerous resources,
strong financial aspects, and most of all we use it reasonable.
Executive summary
Rationale of research
This research has been conducted to identify the causes of delay
in airport construction projects.
Objectives of study
To identify factors involved in delay in construction of airport
projects completed and which are under construction and to develop a frame work
for remaining or under construction projects of airports.
Methodology
The exploratory research method is used for literature review,
to study and analyze project management of taxiway S1 in Noi
Bai international airport in terms of strengths & weakness and to propose
recommendations.
Findings and conclusion
The problem
of delay time in the project construction of aviation infrastructure in Viet Nam is a serious problem. The results of this
study provide a framework for project management can better understand the
dynamics of project management and implementation of efforts to reduce incidences
of delay time.
It was found
that there are some important factors affecting the project time in
implementing to build aviation infrastructure project. Completion time of any
project is effected by the factors: Namely policy, budget, human source and materials.
Recommendations
In order to consider improving schedule of transport
construction project, five
policies having the most potential were evaluated. The result showed that delay
can be reduced by carrying out several important policies during the construction
phase including:
·
Design
accuracy
·
Budget
·
Bidding document
·
Fluctuation and scarcity of material
·
Quality contractor (design, construction,
consultant).
For future
research:
·
Expand the model boundary assumptions to
include other project stage, may comprise of design stage, bidder stage and
deeper involvement of other parties.
·
Incorporate of deeper related with governmental
institutions such as policies of government and inconsistencies in laws and
aviation authority regulations.
·
Base on
measurement, we can find out the good way to manage and finish the project on
time, avoid the mistakes that it is occurring in the construction of transport
infrastructure in Viet Nam.