Quality
Management System of Project Owner
A
Case Study of Bong Do Housing Development Project
By
Pham Viet Cuong
Abstract
Report shows
the basic concepts of quality management systems in general and quality
management systems in construction industry in particular that is an important
factor for an organization to develop and build trust with customers.
In
addition, the report also mentions the benefits of application and development
quality management system of an orgnization. Based on the basic theories of
quality management systems, this report has studied the application of quality
management system of An Lac JSC, a company invests in real estate sector. At the same time, the report also analyzes
the major problems that arise during the application of QMS and give solutions
to solve these problems and the strengths and weaknesses of An Lac’s QMS.
The
problems and solutions are given in this report, although limited, will help An Lac JSC understands quality management system
which they are applying, from which propose the necessary
adjustments to enhance and improve this system.
Executive summary
Rationale of research 
This research has been conducted to identify the problems in
Quality Management System (QMS) for project owner in housing development
project. 
Objectives of study
To study Quality Management System (QMS) of Project Owner (An Lac
JSC) in Bong Do housing development project from design to construction stage
and to analysis the major problems of QMS of An Lac JSC and propose the
solutions to solve these problems.  
Methodology 
The exploratory research method is used for literature review,
to study and analyze QMS, quality policy and measurement, analysis and
management.
Findings and conclusion
From the Case Study about the existing Quality
Management System of An Lac JSC, it is observed that An Lac JSC has established
the QMS that embraces the procedures from Design stage to Construction stage to
ensure that work quality of each stage is controlled and managed well.
At Design stage, the procedure is established to the
guideline for controlling of the design to ensure that the designs are complied
with specifications, law and customer requirements including time schedules.
Scope and responsibility of Design Control are also regulated clearly in
procedure. A Lac JSC has established the Design Team Management that governed
by Chief of Department to control the Designs of the Company.
At Tender Stage, the procedure is established to ensure that the Company
has a good contractor who has capacity, ability, performance and good quality
control system to support the Company Project. Fully responsibility of this
stage is of Economy - Planning - Investment Department (The Planning Team
Management) that includes investigation, evaluation, and selection of
Contractors for Company Project. 
At
Construction stage, the procedure is established to ensure that the Company has
a good Construction Quality Management process during the execution of the
Company Project. This stage is controlled by Project Management Unit (Project
Management Team) that governed by a Project Manager who is the representative
of Owner on Site and has overall responsibility for the project management. The
Project Management Team is responsible that the quality of buildings
construction of the project conforms to the client as well as owner
requirements and the project is completed on time.    
However, the existing Quality Management System of
An Lac JSC still has problems relating work quality from Design stage to
Construction stage that impact significantly on quality of project company,
including unclear requirements at design stage,
change the design, error of Bidding documents at
tender stage, or scope of work (missing contract review) at construction stage,
lack of process control, lack of quality records, etc.
In additional, besides the reasons of lacking of
work procedures, another reason is that heterogeneous perception in quality
exists in mind of staffs as well as leaders of An Lac JSC. So, it is necessary
to conduct the internal quality audit and provide training at different
position in order to gain the same level of quality perception in An Lac JSC. 
 