Construction
activities involve quality management systems, but in
practice there are a lot of poor works that worries the owner because it usually
resulting to waste of money and also cause danger to people.
To ensure the effective application of quality management
for construction projects, it requires the strong commitment of business
leaders and implementation of multiple solutions. Apply effective quality
management that will bring many potential benefits for businesses. Le Van Thong made a case study which
objectives were summarized such as follows:
1. Determination of quality management
activities in the construction in the Oil and Gas Company
2. To discuss and review the
effectiveness of quality management in construction of the Oil and Gas Company
Conclusions
Quality management system has been
applied by PTSC companies in their projects. It brings success to the company
for many years now, and became a famous company in the international market in
oil and gas technical services industry in Vietnam. They are the useful tools
to avoid and mitigate problems and to improve quality performances of their projects.
They are the principles that management use to achieve effective cost control,
quality control, schedule control etc. Many civil and industry construction
Corporations, companies in developed countries have been applied the successful
Quality Management and got more profits and reduced lost time, and cost for
reworks. They recognize the importance of the Quality Management and have
responsibilities to identify, assess, prevent and manage all breakdowns and
risks to projects, damage to property and working environment.
The quality improvement programs
establish actions for achieving the objectives and targets, in line with the
policy commitment of continuous improvement. When establishing targets, the
following will be taken into consideration:
1. Who do? How? Who supervise the
provision of information; as executive / coordination / control is assigned in
advance and all agents involved must comply.
2. The system clearly and closely
flexibility have created a positive consequence of works completed on schedule,
ensure quality and safety.
Effectiveness of the implementation quality
management
After implementation
of the quality management, there are some achieved results such as
below:
1. Quality
Assurance is to obtain completed construction that meets all contract
requirements. Assurance is defined as a degree of certainty. Quality assurance
personnel continually assure that the contractor's works comply with contract
requirements.
2. Quality
Control is the successful execution of a realistic plan to ensure that the
required standards of quality construction will be met. In QC, the contractor
defines procedures to manage and control his own, designer of record,
consultant, architect-engineer, all subcontractor and all supplier activities
so that the completed project complies with contract requirements. For design-build contracts this includes
providing and maintaining a Design Quality Control plan as a part of the
overall contract QC plan. This plan, as
a minimum, must assure that all documents are reviewed by a technically
competent, independent reviewer specifically named in the plan. This review cannot be performed by the same
designers that produced the product. The
design QC plan must be managed by a Design QC Manager who has verifiable
engineering or architectural design experience or is a registered engineer or
architect. The Design QC Manager is
under the supervision of the QC Manager.
Recommendations
1. The
performance of Quality Management must be carried out permanently in the
company to prevent all budget overrun, progress slow, reworks maybe happening
from the existing projects and future projects.
2. The
performance of Quality Management must be concerned from the top management to
everybody in the company.
3. Examine
the quality control methods being used to determine if the contractor is
properly controlling design activities in design-build contracts.
4. Examine
the quality control methods being used to determine if the contractor is
properly controlling construction activities.
5. Make
certain that the necessary changes are made in the contractor's QC system, if
excessive construction deficiencies occur.
6. Assist the
contractor in understanding and implementing the contract requirements.
7. Examine
ongoing and completed work.
8. Produce
the quality specified in the plans and specifications and for design-build
contracts in the Request for Proposal, as well as the contractor's accepted
proposal.
9. Develop
and maintain an effective QC system.
10. Perform
all control activities and tests.
11. Prepare
acceptable documentation of QC activities.
In an organization or business will have a lot of
construction projects, any project also is importance. Ensure the quality of the
project is very important for each organization. Aware of that, the quality
management has been applied widely in their construction projects. But how
apply the successful model of quality management for a construction project
that is still a big question.
Organizations
in Vietnam as some other countries, in face, the signers disclaim the
possibility of anticipating and detailing everything in the construction
documents. Second, it is unstable for the construction environment. The
complexity and size of project vary. Working conditions cannot be somewhat
control. The employee is variable; its composition, motivation and size change.
Cooperation between contractor and subcontractors is problematic. Those will
affect the quality management of construction projects and it makes the project
to delay, re-work and increase cost.
So, how to
manage the quality of the construction project effectively? This thesis will
research about quality management in construction project through theory and
real case that is applied in PTSC Production Services Company.
1 comment:
Nice blog! Very interesting and informative post….Thank's for sharing such a nice information….Keep it up!!
B Tech for working professional
Best institutes for B Tech in Chandigarh
B tech for working professional
Post a Comment