Management
of Road System Construction under the General Construction Planning by the year
2020 of Cau Giay District, Hanoi City
By
Le Van Thu
Abstract
The district of Cau Giay is one of Hanoi’s districts achieving
high-speed urbanization level. Along the district’s urbanization process, many
new traffic systems have been constructed and developed, contributing to
renovating and modernizing the general urban picture of Hanoi in general and of
the district in particular. However, beside the achievements, there remained a
lot of weaknesses in the district’s construction and management of urban
traffic systems, especially in that of road systems. This study points out the
significant problems existing in Cau Giay’s construction and management of road
systems. Among those is the development of road systems in the districts are
not catching up with Hanoi’s current urbanization process. 
In fact,
the construction and management of urban landscape along the district’s streets
is not efficient. The local technical infrastructures in some areas of the
district are not modern and synchronous enough. There remain a lot of problems
in the activities of technical infrastructure construction management in
accordance with the district’s general construction plan. Based on the facts
and figures, the study refers to the theories to describe the roles of road
systems in the city’s urbanization process as well as the role of planning road
networks in the city’s general urban plan. It also mentions the requirements
and legal basis of road system management under the general construction plan. 
In the
following part, the study use Cau Giay as a case study for this topic, in which
solutions to all the existing problems in the district’s road systems
management are analyzed so that the road system development is in accordance
with the district’s general construction plan by 2020. 
To the study’s conclusion, it is essential to build traffic
systems synchronized with the district’s other technical infrastructure
systems. At the same time, there need to pay more attention in improvement of
the local residents’ compliance with the regulations on construction. In
addition, the study also emphasizes that importance of building short-term
investment plan within the long-term plan for road system construction and
attract the other investment sources beside the state budget by encouraging the
various investment firms such as BT (Build- Transfer), BOT (Build – Operate –
Transfer) and BTO (Build – Transfer – Operate).
Executive summary
Rationale of research 
This research has been conducted to identify problems in road system of Cau Giay
District, Hanoi City.
Objectives of study
To study, analyze and assess road
system construction under the general construction planning of Cau Giay
District, Hanoi City. propose solution to improve efficiency the general
construction planning of Cau Giay District, Hanoi City.
Methodology
  
The exploratory research method is used to study road management
Cau Giay
District, Hanoi City and the current Vietnam regulations for road management.
Findings and conclusion
Management of the road system under the construction
planning is a complicated work and relates to a lot of sectors. The road system
construction planning management may be assessed comprehensively as follows:
         Attained
results: Some new roads have been planned and developed in accordance with the
approved planning, forming beautiful, modern and sychronous streets for
technical infrastructure and landscape, settling difficulties occured from the
urbanization process. Management of construction planning has been regulated
and improved suitable to the practice for the first step.
          Shortcomings:
Beside the attained results in the road system managementconstruction planning,
there are still shortcomings to be settled: construction of many roads is in
confusion, not in accordance with the planning; the spontaneous building of
works along streets still exists and is not timely prevented. The reality
requires strenthening management of construction planning of the road system
re-organization of construction administration agency, improvement of
inspection and supervision of construction in conformity to the planning,
supplementation and completion of regulations on disciplines for violations in
road construction.
            Therefore,
we have to correctly assess the real situation of the construction and
development of the road system subject to the construction planning to give
solutions for effective management and construction, contributing to and
accelarating the developement of Cau Giay District in coming time.
To conclude, it is very neccessary to manage the
construction of road system in Cau Giay District under the general construction
planning in order to improve the living standards, conforts and create
favorable environment for urban inhabitants. 
Therefore,
the topic “Management of road system under the general construction planning by
2020 in Cau Giay district, Hanoi city” aiming at proposing measures on
management in order to increase the efficiency of road system construction in
accordance with the general planning of Cau Giay district. This topic is
practical and high feasible in order to speed up the urbanization of Cau Giay
district; at the same time, solving inadequate situation caused by the
urbanization. In addition, the topic has specialized and completed measures on
management of road system construction and local reform, serving practically
the economic, cultural and social development of Cau Giay district in
accordance with Hanoi Capital planning by 2020. 
Recommendations 
- In the investment and construction of road system, besides the construction of new urban areas, it must be focused on the investment of infrastructure reform with existing construction area.
- Routes must be defined the heart and boundary line that have been approved and closely managed, avoiding re-occupying and violating boundary line.
- Positively taking part in the completion of legal document system on management of urban construction planning as well as management of urban roads; proposing difficulties during the execution; simultaneously, increasing the work of construction management as planned.
- Increasing capacity of management, adding power and responsibilities of ward-level authority in the work of management of road system construction and management of road boundary line.
 
3 comments:
This type of education system is best for the student. All study are work on the online. Students are study easily to anywhere. You are professionally to work on your projec
http://www.eduberry.com/
This is what I am looking for now, it’s lucky that I found it here,
I’m so glad I found this site…Keep up the good work I read a lot of blogs on a daily basis and for the most part, people lack substance but, I just wanted to make a quick comment to say GREAT blog. In your next post, provide the Short Term Management Courses, so that students come to know about the colleges. Thank for the sharing.
Post a Comment